Power Network Application Trainer
– Earthing / Grounding network impedance measurement
98
4.1.3 S
– Flex measuring method by using one Flex-clamp
4.1.3.1 S
– Flex measuring method by using one Flex- clamp with
simulated
regular pylon’s foot condition and resistance earth
character
Figure 67-2: S-Flex measurement setup with MI 3290
This exercise presents procedure how to perform complete earth measurement on the
transmission pylon with four foots with only one flex clamp.
Switch position Simulated condition
Application
Expected result
Regular measurement place
condition (simulated resistive earth
character), one flex clamp
Pylons (mono and multi-leg)
with and without protective earth
cable connection
Ski lifts
Radio towers
Foot Nm. 1 approx.
22,4 Ω
Foot Nm. 2 approx.
10,9 Ω
Foot Nm. 3 approx.
22,1 Ω
Foot Nm. 4 approx.
5,47 Ω
Z
tot calc
= 2,74 Ω
Table 23-2: S-Flex measurement setup/result
Measuring procedure
1. Select proper switch position on the training module:
Содержание MI 3298
Страница 55: ...Power Network Application Trainer Earthing Grounding network impedance measurement 55 ...
Страница 56: ...Power Network Application Trainer Earthing Grounding network impedance measurement 56 ...
Страница 124: ...Power Network Application Trainer Earthing Grounding network impedance measurement 124 ...
Страница 228: ...MI 3290 Earth Analyser 228 ...
Страница 229: ...MI 3280 Digital Transformer Analyser 229 ...
Страница 230: ...MI 3280 Digital Transformer Analyser 230 ...
Страница 231: ...MI 3250 MicroOhm 10A 231 ...
Страница 232: ...MI 3205 TeraOhmXA 5kV 232 ...