![background image](http://html1.mh-extra.com/html/megger/adx15/adx15_user-manual_1765525136.webp)
10. During sequenced DC testing, you can monitor test progress, viewing applied voltage along with current and
resistance values as they are collected. The software adds markers to key points in the test process where IR, DA, PI,
and HiPot testing completes.
NOTE: If Temperature Compensation is used (set in this screen using the drop-down list, or in the active
test configuration) the MΩ field will display the corrected value based on that compensation, not the
direct calculated value. You can change this display during testing by changing the value in the Temp
Compensation drop-down list.
11. Testing begins immediately and runs non-stop unless a failure is encountered.
NOTE: Use the E-STOP button on the lower right of the ADX front panel to stop the test and quickly de-
energize the high-voltage leads if needed.
Fig 124:
Auto DC Test screen—test in progress.
12. When testing completes, a small dialog appears in the middle of the screen showing the progress of the discharge
process (in volts). When the dialog disappears, the indicator will turn off.
www.megger.com
Megger Baker ADX User Guide
126
Sequenced Tests Mode
Содержание ADX15
Страница 1: ...Megger Baker ADX Automated Diagnostic Test Equipment User Guide...
Страница 2: ...www megger com Megger Baker ADX User Guide...
Страница 10: ...www megger com Megger Baker ADX User Guide viii Table of Contents...
Страница 44: ...www megger com Megger Baker ADX User Guide 34...
Страница 84: ...www megger com Megger Baker ADX User Guide 74 Routes...
Страница 148: ...www megger com Megger Baker ADX User Guide 138...
Страница 172: ...www megger com Megger Baker ADX User Guide 162...