
5A-32
LOWER UNIT
90-13645--2
1095
Gear Housing Pressure Test
1. Remove vent plug and install pressure test gauge
2. Pressurized housing to 10 to 12 psi and observe
gauge for 5 minutes.
3. Rotate drive shaft,prop shaft and move shift shaft
while housing is pressurized to check for leaks.
4. If pressure drop is noted, immerse housing in wa-
ter.
5. Re-pressurize to 10 to 12 psi and check for air
bubbles.
6. Replace leaking seals as necessary. Retest hous-
ing.
Note: Gearcase should hold 10 to 12 psi for 5 min-
utes.
7. Remove tester from housing and install vent plug.
Filling Gear Housing With
Lubricant
NOTE: Gear housing lubricant capacity is 22.5 fl. oz.
(665.2ml).
WARNING
If gear housing is installed on engine, to avoid
accidental starting, disconnect (and isolate)
spark plug leads from spark plugs before working
near the propeller.
Do not use automotive grease in the gear housing.
Use only Quicksilver Gear Lube or Quicksilver
Super-Duty Lower Unit Lubricant.
CAUTION
1. Remove any gasket material from “Fill” and “Vent”
screws and gear housing.
2. Install new gaskets on “Fill” and “Vent” screws.
IMPORTANT: Never apply lubricant to gear hous-
ing without first removing “Vent” screws or gear
housing cannot be filled because of trapped air.
Fill gear housing only when housing is in a verti-
cal position.
3. Remove lubricant “Fill” screw and gasket from
gear housing.
4. Insert lubricant tube into “Fill” hole, then remove
“Vent” screws and gaskets.
5. Fill gear housing with lubricant until excess starts
to flow out of one (first) “Vent” screw hole.
6. Replace this lubricant “Vent” screw and gasket
only and continue filling until excess starts to flow
out of second lubricant “Vent” screw hole.
51552
a
b
c
a - Vent Screw
b - Fill/Drain Screw
c - Oil Level Vent Screw
Содержание 100
Страница 4: ...GENERAL INFORMATION AND SPECIFICATIONS 1 ...
Страница 18: ...IGNITION SYSTEM ELECTRICAL AND IGNITION A 2 ...
Страница 30: ...11669 BATTERY CHARGING SYSTEM AND STARTING SYSTEM ELECTRICAL AND IGNITION B 2 ...
Страница 58: ...22480 TIMING SYNCHRONIZING ADJUSTING ELECTRICAL AND IGNITION C 2 ...
Страница 71: ...WIRING DIAGRAMS ELECTRICAL AND IGNITION D 2 ...
Страница 86: ...FUEL SYSTEM AND CARBURETION A 3 ...
Страница 118: ...OIL INJECTION SYSTEM B 3 ...
Страница 127: ...20032 3 CYLINDER ENGINES POWERHEAD A 4 ...
Страница 168: ...791 H GEAR HOUSING LOWER UNIT A 5 ...
Страница 170: ...5A 1 90 13645 2 1095 LOWER UNIT Notes ...
Страница 205: ...MID SECTION LOWER UNIT B 5 ...
Страница 207: ...5B 1 90 13645 2 495 LOWER UNIT Notes ...
Страница 218: ...SHOCK ABSORBER LOWER UNIT C 5 ...
Страница 223: ...17250 DESIGN I SIDE FILL RESERVOIR POWER TRIM A 6 ...
Страница 233: ...6A 9 POWER TRIM 90 13645 2 495 Commander Side Mount Remote Control Wiring Diagram ...
Страница 268: ...DESIGN II AFT FILL RESERVOIR POWER TRIM B 6 51344 ...
Страница 305: ...SINGLE RAM POWER TRIM C 6 51485 ...
Страница 309: ...6C 3 90 13645 2 495 POWER TRIM Notes ...
Страница 340: ...50099 ENGINE ATTACHMENTS ENGINE INSTALLATION 7 A ...
Страница 369: ...TILLER HANDLE AND CO PILOT OUTBOARD MOTOR INSTALLATION ATTACHMENTS 7 B ...
Страница 371: ...7B 1 90 13645 2 495 OUTBOARD MOTOR INSTALLATION ATTACHMENTS Notes ...