
Maintenance
Shipping
76
MagneMotion
Rockwell Automation Publication MMI-UM002E-EN-P - March 2016
1.
Turn off and disconnect all electrical and pneumatic power as detailed in
2.
Disconnect all communications connections as detailed in
3.
Ensure the system or component has been properly decontaminated following the
facilities decontamination procedures. Follow all facility, local, and national proce-
dures for the disposal of any hazardous materials.
4.
When shipping individual components, remove all components that will be shipped
(refer to the
and reverse the sequence to
remove components) and refer to
When shipping systems, refer to
Shipping Systems or System Sections
Shipping Components
1.
Each component should be wrapped, bagged, and packed following standard packing
procedures.
2.
Using the containers the component was originally shipped in, set the component into
the container and secure using the supplied packing material.
3.
Close the shipping container and secure.
4.
Ensure the container is properly labeled (This End Up, Caution - Heavy, etc.) and all
shipping documents are attached to the outside of the container.
5.
When shipping to MagneMotion, ensure the SRO number is clearly visible on the out-
side of the box.
Shipping Systems or System Sections
1.
Bolt the feet to the bottom of the crate.
2.
Install brackets to secure the leg outriggers to the bottom of the crate.
3.
Ensure all hardware on the system is properly secured.
CAUTION
Magnetic Field Hazard
When shipping pucks or magnet arrays ensure the
shipping container properly isolates the magnets and
identifies the Magnetic Field Hazard.
Содержание MagneMover LITE
Страница 1: ...MagneMover LITE User Manual ...
Страница 284: ...Operation 28 MagneMotion Rockwell Automation Publication MMI UM002E EN P March 2016 This page intentionally left blank ...
Страница 381: ...MagneMover LITE User Manual 501 Rockwell Automation Publication MMI UM002E EN P March 2016 Notes ...