
Installation
Transport System Installation
MagneMover LITE User Manual
29
Rockwell Automation Publication MMI-UM002E-EN-P - March 2016
Mounting NC-12 Node Controllers
The Node Controller should be located close to the Nodes it is responsible for to minimize the
length of all wiring. The controller may be oriented in any direction required ensuring the ser-
vice and exclusion zones identified in
are maintained.
Mounting Plates
The typical method for mounting the Node Controller is vertically on one of the transport sys-
tem legs by attaching the optional mounting plates as shown in
.
Figure 5-15: NC-12 Node Controller Mounting Plates
1.
Insert two M8 T-nuts and rotate into position in the appropriate channel(s) of the
frame.
2.
Install the mounting flanges onto the Node Controller, if not already installed. Apply
Loctite 243 to four 1/4-20 flat head screws and tighten to 10.1 N-m [90 in-lb], maxi-
mum thread length into threaded hole = 7.87 mm [0.310 in].
3.
Orient the Node Controller as required and secure it to the T-nuts, apply Loctite 243 to
two M8 screws and install with M8 split lock washers and tighten the screws to
26 N-m [230 in-lb] using a 6 mm Hex bit.
NOTE:
The Loctite must cure for 2 hours at 22° C [72° F] before using the transport
system.
4.
Install an M5 T-nut and secure a nylon cable tie holder to it using an M5 x 12 mm
screw on the leg as required to secure the cables running to the Node Controller using
cable ties.
M8 Screw
(2X)
1/4-20 Flat Head Screw
(4X)
Mounting Plate
(2X)
M8 T-Nut
(2X)
M8 Lock Washer
(2X)
M5 T-Nut
Cable Tie Holder
M5 Screw
Содержание MagneMover LITE
Страница 1: ...MagneMover LITE User Manual ...
Страница 284: ...Operation 28 MagneMotion Rockwell Automation Publication MMI UM002E EN P March 2016 This page intentionally left blank ...
Страница 381: ...MagneMover LITE User Manual 501 Rockwell Automation Publication MMI UM002E EN P March 2016 Notes ...