57
Refrigerant Piping System Installation for Heat Pump Operation
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
Outdoor Unit Y-Branch Kits
Table 27: Outdoor Unit Y-Branch Kit Model Nos.
Model No.
Y-Branches
(for outdoor unit connection)
Use to Combine Two Frames
Use to Combine Three Frames
ARCNN21
ARCNN21
ARCNN31
Y-Branches For Dual-Frame Systems
Y-Branches For Triple-Frame Systems
Multi-Frame
Connector
Combination
Vapor pipe
Liquid pipe
ARCNN21
Unit: inch
5-1/8
I.D. 1-1/2
O.D.1-3/8
I.D. 1-5/8
16-3/8
16-1/16
4-3/8
I.D. 1-3/8
I.D. 1-1/4
I.D. 1-1/8
I.D. 1-1/8
I.D. 1-1/8
I.D. 7/8
4-3/4
I.D. 7/8
I.D.
3/4
O.D. 1-1/8
13-1/16
12-3/8
O.D. 3/4
O.D. 5/8
4/
3
.
D
.I
I.D. 5/8
I.D. 5/8
I.D. 5/8
I.D. 7/8
4-3/8
I.D.1/2
I.D. 1/2
I.D.1/2
I.D. 3/8
2-3/4
3-5/16
I.D.3/8
Combination specification
Vapor pipe
Liquid pipe
ARCNN21
ARCNN31
B
B
5-1/8
I.D. 1-1/2
O.D.1-3/8
I.D. 1-5/8
16-3/8
16-1/16
4-3/8
I.D. 1-3/8
I.D. 1-1/4
I.D. 1-1/8
I.D. 1-1/8
I.D. 1-1/8
I.D. 7/8
4-3/4
I.D. 7/8
I.D.
3/4
O.D. 1-1/8
13-1/16
12-3/8
O.D. 3/4
O.D. 5/8
4/
3
.
D
.I
I.D. 5/8
I.D. 5/8
I.D. 5/8
I.D. 7/8
4-3/8
I.D.1/2
I.D. 1/2
I.D.1/2
I.D. 3/8
2-3/4
3-5/16
I.D.3/8
I.D. 1-3/8
O.D. 1-3/8
4-15/16
16
13-15/16
4-3
/8
I.D. 1-5/8
I.D. 1-1/8
4-3/4
I.D. 1-5/8
I.D. 7/8
I.D.
3/4
O.D.1-1/8
I.D. 1-3/8
I.D. 1-1/2
O.D. 3/4
O.D. 3/4
I.D. 5/8
I.D.
7/8
I.D. 1/2
13-3/16
11-1/16
3-5/16
I.D.
3/8
O.D. 3/4
I.D. 5/8
O.D. 1/2
I.D. 1/2
I.D. 1/4
X2
4-3/8
4-3/8
Multi-Frame
Connector
Unit: inch
Outdoor Unit Y-Branch Kits
INSTALLING FOR HEAT PUMP
OPERATION