Due to our policy of continuous product innovation, some specifications may change without notification. ©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. “LG” is a registered trademark of LG Corp.
*This form must be completed and submitted to LG a minimum of three (3) weeks prior to final scheduling of any startup.
Note: If any of the above items are not complete at time of start-up, back charges will be assessed for additional costs.
Contractor Name: ______________________________________ ____________________________________________________
(Authorized
Signature)
Address: ____________________________________________
____________________________________________
Phone: _____________________________________________ Date: _______________________________________________
Initiate a Commissioning Request
Description
Check
Verify this checklist and requirements herein have been met. Complete this checklist in its entirety BEFORE initiating a request for
Commissioning.
Send all Pre-Commissioning Package Documents to your LG Applied Representative.
Prepare Pre-Commissioning Package Documents
Include
Check
1. A copy of the refrigerant piping system(s) shop drawing(s) generated by LATS Multi V pipe design software.
2. A copy of the pipe fitter’s pipe changes and field notes.
3. A verified copy of the “As-Built” LATS Multi V Project file (*.mtv) that includes all changes noted by the pipe fitter(s) in
Number 2. The tree diagram notes should include changes to the line lengths used for each liquid line segment
4. A copy of a completed and verified Installation Checklist for the outdoor unit(s), indoor units, ERVs, heat recovery unit (for
Heat Recovery systems only) Air Cleaners, and Control Devices. Correct any procedures needing attention before initiating a
request for commissioning..
5. A copy of the air balance report showing proper airflow at all indoor units.
6. A completed Pre-Commissioning Device Configuration Worksheet.
7. A completed copy of the Pre-Commissioning Checklist.
8. If available, a list of IP addresses obtained from the building owners IT department for each ACP, BACNet, LonWorks, AC
Smart devices.
PRE-COMMISSIONING
CHECKLIST
Page 2