Handbook OPTIFLEX 1300 C
OPTIFLEX
1300
C
24
Installation requirements
•
the stilling well must be electrically conductive
•
stilling well wall must be straight and smooth (surface roughness ±0.1 mm or 0.004")
•
no abrupt changes in well diameter greater than 1 mm or 0.04"
•
drill a pressure equalization hole in the stilling well above the maximum product level
•
an opening in the base is normally sufficient for one-liquid applications
•
if foam is not present, drill other holes along the length of the stilling well: this helps the product to
circulate, especially where there is more than one liquid. These must be small, widely spaced and
deburred
•
probe counterweights in stilling wells: check that there is sufficient (but not too much) play between the
counterweight and the inside wall of the stilling well for the product to circulate
Содержание optiplex 1300 c
Страница 1: ......
Страница 49: ...Handbook OPTIFLEX 1300 C 49 OPTIFLEX 1300 C 1 Volume measurement of liquids...
Страница 50: ...Handbook OPTIFLEX 1300 C OPTIFLEX 1300 C 50 2 Volume measurement of solids...
Страница 51: ...Handbook OPTIFLEX 1300 C 51 OPTIFLEX 1300 C 3 Mass measurement of liquids or solids...
Страница 62: ...Handbook OPTIFLEX 1300 C OPTIFLEX 1300 C 62 Finding the advanced setup menu...
Страница 95: ...Handbook OPTIFLEX 1300 C 95 OPTIFLEX 1300 C Note...