63
Operating Instructions
SEG
8 Commissioning
•
Ensure that pull-rope (
20
) cannot be moved either
by external influences or by the method of installa-
tion.
•
Observe the instructions in the documentation on
the pull-rope system.
3. Check that the pull-rope emergency stop switch is
mounted in the center between the two attachment
points (
22
). If the pull-rope emergency stop switch is
not mounted in the center, remount the pull-rope
emergency stop switch
.
4. Fasten pull-rope (
20
) to the right and left of trigger
lever (
1
). Observe the instructions in the documenta-
tion on the pull-rope system.
5. Set the tension of pull-rope (
20
) on both sides of trig-
ger lever (
1
) in accordance with the instructions in
the documentation on the pull-rope system.
6. Check whether the same forces are being exerted
on both sides of trigger lever (
1
). To do this, switch
reset lever (
2
) to switch position "0"
Trigger lever (
1
) must be in a vertical position.
Fig. 8-1:
Function of the pull-rope emergency stop switches SEG
Reset lever (
2
)
Pull-rope emergency stop switch SEG
Trigger lever (
1
)
Actuation path: max. 300 mm
Actuation force: max. 125 N
Pull-rope (
20
)
Attachment point (
22
)
Attachment point (
22
)
Direction of actuation
Pull-rope guide (
21
)
Actuation path: max. 300 mm
Actuation force: max. 125 N
Содержание SEG
Страница 1: ...OPERATING INSTRUCTIONS Pull rope emergency stop switch Type SEG...
Страница 6: ...6 SEG Operating Instructions Table of Contents...
Страница 71: ...71 Operating Instructions SEG...