WireWorks
®
Panel System
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
11
Attaching Enhanced
Horizontals To Verticals
Enhanced Horizontals are used at
the top and bottom of a panel to
space the vertical posts apart
the appropriate distance for the
panel width you are building.
One rail is used at the top of the
panel with the opening facing
upward and one rail is used at
the bottom facing downward.
Panels that are made up of more
than one tile use additional
standard construction horizontals
at intermediate heights (with the
opening facing up).
Note:
Refer to the
space-planning layout to
determine which panels receive
enhanced horizontals.
1. Slide an enhanced horizontal into
the top of a vertical half post with
the rivets above the embossed
area on the post. Making sure all
four rivets are lined up with the
corresponding embosses, tap the
horizontal into place with a
dead-blow style mallet
(Figure 10).
2. Referring again to the
space-planning layout, position
the appropriate vertical post
(full or half post) relative to
the horizontals and tap the
horizontals into place (Figure 11).
3. Repeat the above instructions,
building out in a direction
perpendicular to the first
horizontals from the corner post.
When this step is completed you
should have a partially assembled
90° corner that can support itself.
(Figure 12).
Содержание WireWorks
Страница 1: ...Assembly Instructions WireWorks Panel System January 2020...
Страница 2: ...A...
Страница 46: ...44...
Страница 47: ...45...