WireWorks
®
Panel System
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
43
Unloaded Panel Runs
For unloaded panel runs, the
maximum length of a run is
12’ and the return panels must
be at least 48” wide and within
18” in height of the main run of
panels. Panels may be stacked
to a maximum height of 12’ and
must remain below the height of
the ceiling, but the returns must
remain within 18” in height of the
main run. Any combination of
glass, open, or acoustic panels
is allowed.
Stacking Section Guidelines
Use the following specifications
when applying stackable
sections. Stackable sections must
always remain below the ceiling.
Multiple stacking sections must
begin with a standard nonstacked
vertical post. To stack on top of
a fully assembled panel, at least
7” of clearance should be left
between the top of the panel and
the ceiling. If less clearance is
available, the panel frame must
be disassembled before adding or
removing stacking sections.
Содержание WireWorks
Страница 1: ...Assembly Instructions WireWorks Panel System January 2020...
Страница 2: ...A...
Страница 46: ...44...
Страница 47: ...45...