![KI WireWorks Скачать руководство пользователя страница 33](http://html1.mh-extra.com/html/ki/wireworks/wireworks_assembly-instructions-manual_1963116033.webp)
WireWorks
®
Panel System
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
31
Data Cabling Behind Raceway
Tiles
Every raceway tile includes a steel
wiring trough to hold data cables
and provide steel separation
between power and data wiring.
A total of 24, 0.20 diameter, four
pair, UTP data cables can be
routed in the cable trough behind
a raceway tile. If a rigid wireway
is not used, then two cable
troughs can be utilized to allow
a total of 48, 0.20 diameter, four
pair, UTP data cables behind the
raceway tile.
1. Hang the trough in the slots in
the vertical approximately 1”
below the horizontal rail. This
allows room for a rigid wireway
and data jacks below the trough.
Data cabling is simply laid into
the trough (Figure 44). Troughs
can be used back-to-back.
Note:
If the trough is installed
more than 1” below the
horizontal, it will interfere with the
bezel of the raceway tile.
Note:
Small notches are
provided in the trough to help
manage wires between the trough
and a data jack below it. The
wires can be laid into the notch
and then wire-tied in place using
the hole under the slot
(Figure 45).
Содержание WireWorks
Страница 1: ...Assembly Instructions WireWorks Panel System January 2020...
Страница 2: ...A...
Страница 46: ...44...
Страница 47: ...45...