WireWorks
®
Panel System
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
27
Data Cabling Under Top Cap
Data cabling can be laid in the
trough of the top horizontal rail
(contained under the top cap).
1. Begin laying the necessary
cabling in the trough of the
top horizontal rail. For 90°
intersections, the optional 90°
top cap cable guard can be slid
in between half posts to enforce a
1” minimum bend radius around
90° corners (Figure 39).
2. Optional top trough cable gaurd
can be installed for added
protection when laying data
cabling in top horizontal rail
(Figure 39)
3. To run data cabling from the
top cap to other heights in the
panel, route wires down through
the notch in the end of the top
horizontal rail. The horizontal
rail cable guard can be snapped
in place in the notch in the end
of the horizontal rail (Figure 40)
to enforce a 1” minimum bend
radius (Detail J).
Note:
Refer to the Planning
Guide for Cable Management
Capabilities.
Содержание WireWorks
Страница 1: ...Assembly Instructions WireWorks Panel System January 2020...
Страница 2: ...A...
Страница 46: ...44...
Страница 47: ...45...