![KI WireWorks Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/ki/wireworks/wireworks_assembly-instructions-manual_1963116030.webp)
28
WireWorks
®
Panel System
Assembly Instructions
Assemble units as described herein only. To do otherwise
may result in instability. All screws, nuts and bolts must be
tightened securely and must be checked periodically after
assembly. Failure to assemble properly, or to secure parts
may result in assembly failure and personal injury.
Data Cabling Behind Acoustic
Tiles
Data cabling can be run behind
acoustic tiles by using acoustic
tile cable guards and horizontal
cable supports.
Note:
It is recommended
that wires only be run behind
tiles which you will have easy
access to after the installation is
complete. You will not be able to
hang on-module mounted
components in front of areas
where data cabling has been
run. Refer to the diagram on next
page.
1. Install cable guards at the height
you want to run the data cabling.
Position the acoustic tile cable
guard with hooks down and
place the lowest hook in a slot
in the vertical that corresponds
to a pocket. Then push the guard
down to flex the lower portion of
it and pivot the upper hook into
place (Figure 41).
Note:
Each vertical cable guide
behind an acoustical tile can hold
a maximum of six, 0.20 diameter,
four pair, UTP data cables.
Содержание WireWorks
Страница 1: ...Assembly Instructions WireWorks Panel System January 2020...
Страница 2: ...A...
Страница 46: ...44...
Страница 47: ...45...