12.2.2.1 Preparing for transport
Stowing payload
Do not exceed the permissible loading (overall mass, coupling load, axle load).
Observe national traffic laws. If additional loading is not permitted, the load must be transported in
the towing vehicle.
1. Check that loading the machine with tools or accessories during transport is permissible.
2. Place additional loads only in the spaces provided (if available) and secure carefully.
Additional precautions for a very dirty machine
The machine can become very dirty after prolonged use on a construction site. A machine in such
condition is not suitable for towing on public roads.
1. Clean the machine, in particular around the chassis and the lighting and signalling equipment.
2. Check the function of wheels, brakes, lights and signalling equipment.
If defects are found: Correct any defects before towing.
Additional precautions for conditions of snow and ice
Considerable snow or ice may build up on the machine under low temperature conditions.
1.
Accident hazard due to snow or ice falling off the machine.
Snow or ice falling from the towed machine can endanger following vehicles.
Problems with driving dynamics and damage to the machine could occur.
The maximum permissible axle load could be exceeded.
➤ Do not transport the machine if it is covered by snow or ice.
2. Remove any snow or ice before towing.
Perform the following tasks prior to transporting the machine
1. Make sure the towing hitch is compatible with the ball or eye coupling on the towed machine.
2. Check that the machine is shut down and secured against accidental restarting.
3. Detach all connecting lines and hoses.
4. Make sure there are no unsecured tools lying on or in the machine.
5. Close and lock the canopy.
Adjust the towbar to suit the height of the towing vehicle hitch
When the machine is coupled up, the towing bar must be parallel with the ground.
Fig. 72 Transport position
12 Decommissioning, Storage and Transport
12.2 Transport
No.: 9_9548 05 USE
Operator Manual Screw Compressor
M27
219
Option rb/rm/rr, rb/rm/rs
Содержание M27
Страница 244: ...13 Annex 13 2 Pipeline and instrument flow diagram P I diagram 234 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 245: ...13 Annex 13 2 Pipeline and instrument flow diagram P I diagram No 9_9548 05 USE Operator Manual Screw Compressor M27 235...
Страница 246: ...13 Annex 13 2 Pipeline and instrument flow diagram P I diagram 236 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 260: ...13 Annex 13 4 Wiring diagrams 250 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 261: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 251...
Страница 262: ...13 Annex 13 4 Wiring diagrams 252 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 263: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 253...
Страница 264: ...13 Annex 13 4 Wiring diagrams 254 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 265: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 255...
Страница 266: ...13 Annex 13 4 Wiring diagrams 256 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 267: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 257...
Страница 268: ...13 Annex 13 4 Wiring diagrams 258 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 270: ...13 Annex 13 4 Wiring diagrams 260 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 271: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 261...
Страница 272: ...13 Annex 13 4 Wiring diagrams 262 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 273: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 263...
Страница 274: ...13 Annex 13 4 Wiring diagrams 264 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 276: ...13 Annex 13 4 Wiring diagrams 266 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 277: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 267...
Страница 278: ...13 Annex 13 4 Wiring diagrams 268 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 279: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 269...
Страница 281: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 271...
Страница 282: ...13 Annex 13 4 Wiring diagrams 272 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 283: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 273...
Страница 284: ...13 Annex 13 4 Wiring diagrams 274 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 286: ...13 Annex 13 4 Wiring diagrams 276 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 287: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 277...
Страница 288: ...13 Annex 13 4 Wiring diagrams 278 Operator Manual Screw Compressor M27 No 9_9548 05 USE...
Страница 289: ...13 Annex 13 4 Wiring diagrams No 9_9548 05 USE Operator Manual Screw Compressor M27 279...
Страница 290: ...13 Annex 13 5 Fuel circulation diagram No 9_9548 05 USE Operator Manual Screw Compressor M27 281...
Страница 291: ...13 Annex 13 5 Fuel circulation diagram 282 Operator Manual Screw Compressor M27 No 9_9548 05 USE...