4.
Pour grout through the grout hole into the baseplate up to the level of the dam.
When you pour the grout, remove air bubbles from it by using one of these methods:
•
Puddle with a vibrator.
•
Pump the grout into place.
5.
Allow the grout to set.
1
7
6
2
3
4
5
Item Description
1.
Baseplate
2.
Shims or wedges
3.
Grout
4.
Foundation
5.
Sleeve
6.
Dam
7.
Bolt
Figure 18: Pour grout into baseplate
6.
Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.
1
5
4
2
3
Item Description
1.
Baseplate
2.
Grout
3.
Foundation
4.
Dam
5.
Bolt
Figure 19: Fill remainder of baseplate with grout
7.
Remove the leveling jackscrews after the grout hardens in order to remove any stress points.
8.
Tighten the foundation bolts.
9.
Make sure that treatment of the concrete is in accordance with DIN 1045.
4.5 Grout the baseplate
Model IC, ICI, ICH, ICIH Installation, Operation, and Maintenance Manual
35
Содержание Goulds Pumps IC
Страница 1: ...Installation Operation and Maintenance Manual Model IC ICI ICH ICIH ...
Страница 2: ......