Item Description
1.
Machinist's levels
2.
Driver's mounting pads
3.
Foundation bolts
4.
Jackscrews
5.
Grout hole
6.
Pump's mounting pads
Figure 9: Level driver mounting pads
4.
Turn the center jackscrews down so that they rest on their plates on the foundation surface.
5.
Level the pump mounting pads:
NOTICE:
Remove all dirt from the mounting pads in order to ensure that the correct leveling is ach-
ieved. Failure to do so can result in equipment damage or decreased performance.
a) Put one machinist's level lengthwise on one of the two pads.
b) Put the other level across the center of the two pads.
c)
Level the pads by adjusting the four jackscrews in the corners.
Make sure that the machinist's level readings are as close to zero as possible, both lengthwise
and across.
1
2
3
4
5
6
Item Description
1.
Driver's mounting pads
2.
Machinist's levels
3.
Foundation bolts
4.
Jackscrews
5.
Grout hole
6.
Pump's mounting pads
Figure 10: Level pump mounting pads
6.
Hand-tighten the nuts for the foundation bolts.
7.
Check that the driver's mounting pads are level and adjust the jackscrews and the foundation
bolts if necessary.
The correct level measurement is a maximum of 0.167 mm/m | 0.002 in./ft .
4.2 Baseplate-mounting procedures
24
Model IC, ICI, ICH, ICIH Installation, Operation, and Maintenance Manual
Содержание Goulds Pumps IC
Страница 1: ...Installation Operation and Maintenance Manual Model IC ICI ICH ICIH ...
Страница 2: ......