14.
Route and connect the data and power cables.
Hewlett Packard Enterprise recommends using embedded SATA solutions when connecting the cable.
Other options exist. For more information, see the HPE DL360 Gen10 Server cabling matrix on the
Hewlett Packard Enterprise website (
http://www.hpe.com/info/CablingMatrixGen10
).
15.
16.
Install the access panel (
on page 25).
17.
Install the server in the rack.
18.
Power up the server (
on page 24).
19.
Connect each power cord to the server.
20.
Connect each power cord to the power source.
Primary PCI riser cage options
The primary PCI riser cage supports the following:
• Slot 1: Full-height, 3/4-length expansion boards (up to 9.5")
• Slot 2:
66
Primary PCI riser cage options
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...