7.
Install the access panel (
on page 25).
8.
Install the server in the rack.
9.
Connect each power cord to the server.
10.
Connect each power cord to the power source.
11.
Power up the server (
on page 24).
Use the BIOS/Platform Configuration (RBSU) in the UEFI System Utilities to configure the memory mode.
For more information about LEDs and troubleshooting failed DIMMs, see
on page 12.
Installing a high-performance fan
This kit is available to meet some extended ambient operating temperatures above 35 degrees Celsius. For
more information about the qualifications for extended ambient configurations, see the
.
The high-performance fans are used for 8-SFF and 10 SFF drive configurations. They are also required for
the 10 SFF SAS/SATA/NVMe Combo backplane option and for ASHRAE compliant configurations. For more
information on ASHRAE compliant configurations, see the
Hewlett Packard Enterprise website
Prerequisites
Before installing this option, be sure you have the following:
The components included with the hardware option kit
Procedure
1.
Observe the following alert:
IMPORTANT:
After removing a high-performance (dual-rotor) fan, install or replace the fan within 60 seconds.
Otherwise, the server will shut down gracefully.
2.
Power down the server (
on page 24).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
Installing a high-performance fan
43
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...