11.
Connect the SID cables to the front power button/USB 3.0 connector on the system board.
Installing the 4 LFF display port/USB module
Prerequisites
Before installing this option, be sure you have the following:
• The components included with the hardware option kit
• T-10 Torx screwdriver
Procedure
1.
Power down the server (
on page 24).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
98
Installing the 4 LFF display port/USB module
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...