10.
Connect any required internal or external cables to the expansion board.
11.
Install the access panel (
on page 25).
12.
Install the server in the rack.
13.
Connect each power cord to the server.
14.
Connect each power cord to the power source.
15.
Power up the server (
on page 24).
Installing a secondary GPU riser and cable option
Prerequisites
When installing a 3/4-length GPU, a low profile type -a controller must be installed.
Before installing this option, do the following:
• Be sure that the power supplies support the installation of this option. For more information, see the
Hewlett Packard Enterprise Configurator website
• Be sure you have the following items:
◦ The components included with the GPU enablement option kit
◦ T-10 Torx screwdriver
Procedure
1.
Observe the following alerts:
WARNING:
To reduce the risk of personal injury from hot surfaces, allow the drives and the internal system
components to cool before touching them.
CAUTION:
To prevent damage to electrical components, properly ground the server before beginning any
installation procedure. Improper grounding can cause electrostatic discharge.
2.
Back up all server data.
3.
Power down the server (
on page 24).
4.
Remove all power:
80
Installing a secondary GPU riser and cable option
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...