◦ Half-length, half-height expansion boards
◦ 3/4-length expansion boards when either a low-profile type -a controller or no controller is installed.
Installing an optional primary PCI riser board
Prerequisites
Before installing this option, be sure you have the following:
• The components included with the hardware option kit
• T-15 Torx screwdriver
Procedure
1.
Back up all server data.
2.
Power down the server (
on page 24).
3.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
4.
Do one of the following:
a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
5.
6.
Remove the primary PCI riser cage (
Removing the primary PCI riser cage
on page 27).
7.
If needed, remove any expansion boards installed in the riser cage.
8.
Remove the existing riser board from the PCI riser cage.
9.
Install the optional riser board in the riser cage.
Installing an optional primary PCI riser board
67
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...