Procedure
1.
Power down the server (
on page 24).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
4.
5.
Remove the left DIMM guard from the system board.
6.
Assemble the connector/cable harness pin openings to the alignment pegs on the DIMM guard.
7.
Install the plastic cover on the DIMM guard.
8.
Install the DIMM guard, and then connect the cable to the system board.
102
Hardware options installation
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...