HPE Smart Storage Battery option
In the Hewlett Packard Enterprise DL360 Gen10 Server , the Smart Storage Battery can be installed in two
different orientations, depending on configuration:
•
Installing a Smart Storage Battery in 8 SFF and 4 LFF configurations
on page 105
•
Installing a Smart Storage Battery in the 10 SFF SAS/SATA/NVMe Combo backplane configuration
on page 106
Installing a Smart Storage Battery in 8 SFF and 4 LFF configurations
Prerequisites
Before installing this option, be sure you that have the components included with the hardware option kit.
Procedure
1.
Power down the server (
on page 24).
2.
Remove all power:
a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
3.
Do one of the following:
a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
4.
5.
Install the Smart Storage battery and connect the cable.
6.
Install the access panel (
on page 25).
7.
Install the server in the rack.
8.
Connect each power cord to the server.
9.
Connect each power cord to the power source.
10.
Power up the server (
on page 24).
HPE Smart Storage Battery option
105
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...