a.
Disconnect each power cord from the power source.
b.
Disconnect each power cord from the server.
5.
Do one of the following:
a.
Extend the server from the rack (
Extend the server from the rack
on page 24).
b.
Remove the server from the rack (
Remove the server from the rack
6.
7.
If installed, remove the low profile riser cage.
8.
Install the GPU-enabled riser cage (
Installing a secondary full-height PCI riser cage option
on page
73).
9.
Remove the existing rear guide bracket from the GPU, if installed.
10.
If installing a 3/4-length GPU, install the bracket supplied in the kit.
11.
Install the GPU in the riser cage, and then connect the cable to the GPU.
12.
If installing a GPU requiring greater than 75 W, connect the power cable to the primary riser power
connector.
Hardware options installation
81
Содержание ProLiant DL360 Gen10
Страница 75: ...9 Install the full height PCIe x16 riser cage latch 10 Install the riser cage Hardware options installation 75 ...
Страница 79: ... Full length 9 Install the expansion board Hardware options installation 79 ...
Страница 96: ... 4 LFF 9 Guide the SID cable through the front of the server 96 Hardware options installation ...