Site preparation
2-11
Mast
without
braces
Max. free mast
length (steel), (m)
Outer
Diameter (mm)
Wall
Thickness
(mm)
Weight
(kg/m)
0.4
a
a. The height of 0.4 m is not recommended to be used as it will make access through
the ADU’s service hatch difficult.
200
5
24.0
0.6
220
5
26.5
0.8
250
5
30.2
1
270
5
32.7
Table 2-2: Mast dimensions without braces
Mast with 3 braces
Max. free
mast length
(steel), (m)
Outer
Diameter
(mm)
Wall
Thickness
(mm)
Outer
Diameter
for brace
(mm)
Thickness
for brace
(mm)
1.2
140
10
50
5.0
1.2
200
5
50
5.0
1.6
140
10
70
5.0
1.6
200
5
70
5.0
2
160
10
70
5.0
2
220
5
70
5.0
2.5
180
10
80
5.0
2.5
220
5
80
5.0
Table 2-3: Mast dimensions with 3 braces
30-40º
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......