2-1
Chapter 2
Installation
2
This chapter has the following sections:
•
What’s in the box
•
Site preparation
•
Installation of the ADU
•
Installation of the ACU
•
Installation of the GMU
•
To connect the ADU, ACU and GMU
2.1
What’s in the box
2.1.1
To unpack
Unpack the ADU, ACU and GMU and check that the following items are present:
• FV-110GX ADU with 4 lifting brackets (already mounted)
• Accessory kit for FV-110GX ADU:
• Package with bolts, washers and cable glands (2 sizes)
• FV-110GX ACU
• Accessory kit for FV-110GX ACU:
• NMEA multi-connector
• Power cable (230 VAC)
• RJ45 patch cable (1 pce)
• Coax cable F-F, low loss, 75 Ohm (2 pcs)
• Ethernet cable (2 m) (1 pce)
• FV-110GX GMU
• Accessory kit for FV-110GX including
• Wiecon 3.5 mm spacing, 4 pol connector for cable
• RJ45 patch cable (1 pce)
• Power cable 230 VAC
• RS-232/RS-422 cable (2 pcs)
• Installation manual (this manual)
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......