Installation of the ADU
2-17
2.3
Installation of the ADU
The following sections describe the installation and grounding of the ACU. The ADU is
shipped fully assembled. You have to install it on the mast and attach the ADU cable.
Before installing the ADU read the following guidelines.
WARNING!
Use a strong webbed sling with a belt to
lift the ADU without damaging the radome. Make sure
that the sling can carry the ADU’s weight (126 kg).
WARNING!
The ADU may be subject to swaying
motions in windy conditions. Always use tag lines to
stabilise the ADU during hoisting.
Figure 2-15: Use of strong sling with a belt and tag lines for safe hoisting
Current antenna
New antenna
Webbed sling with belts
Tag lines
Tag line
Tag line
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......