Introduction to the built-in web interface
5-2
If you want to use another LAN port to access the web interface you must configure it
as described in
To configure the LAN network
on page 5-23.
3. Open your Internet browser and enter the IP address of the ACU. The default IP
address is http://192.168.0.1.
When the login screen is displayed you have verified that the connection to the FV-
110GX can be established. The web interface is ready for use.
First time login as administrator
For a new installation you must activate local administration and set the admin password.
This is also the case after reset to factory default.
Do as follows:
1. On the ACU keypad, push and hold the left arrow key for 5 seconds.
2. Wait for the very short display of
Local administration
, followed by the event text:
0807F-0 WARNING Local administration enabled
.
This will give you temporary administrator access
for 1 hour or until next restart
.
3. Open your browser and access the web interface.
4. Enter user name:
admin
(no password is required).
The
DASHBOARD
is displayed.
5. To enter or change the password select
ADMINISTRATION
>
User login
and locate
the section
Change Login
.
6. If needed, type in the new password (minimum 8 characters) and click
Change
. No
old password is required.
After the 1 hour window or a restart the administrator password is required.
If you cannot establish a connection there might be problems with the Proxy server
settings of your PC. See
Proxy server settings in your browser
on page 7-4 for further
information.
Figure 5-1: LAN 3 connector used for configuring the FV-110GX
0RGHP
6HUYLFHSRUW
8VHU,QWHUQHWHWF
6KLS¶VQHWZRUN
Figure 5-2: Logon screen
Note
Accessing the ACU with the local administration function
does not change the current administrator password.
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......