What’s in the box
2-2
2.1.2
Initial inspection
Inspect the shipping cartons and wooden box immediately upon receipt for evidence of
damage during transport. If the shipping material is severely damaged or water stained,
request that the carrier's agent be present when opening the cartons and wooden box. Save
all box packing material for future use.
After unpacking the system, i.e. removing the top and sides of the wooden box and
opening the cartons, inspect it thoroughly for hidden damage and loose components or
fittings. If the contents are incomplete, if there is mechanical damage or defect, or if the
system does not work properly, notify your dealer.
2.1.3
Tools needed
• Allen key (4 mm) (Unbraco), included, mounted on a tool holder inside the ADU
radome.
• Torx TX 20 to open the locks of the service hatch
• Wrench to fasten the mounting bolts for the ADU
• Wrench to fasten the N connector at the ADU
• PC and Internet browser
• Crimping tools
2.1.4
Transport of the antenna
During transport the antenna must be able to move freely inside the radome. You must
follow the instructions below to keep a valid warranty:
WARNING!
To avoid electric shock, do not apply
power to the system if there is any sign of shipping
damage to any part of the front or rear panel or the outer
cover. Read the safety summary at the front of this
manual before installing or operating the system.
CAUTION!
Do not lock the antenna dish with the elevation locking pin during
transport.
Do not strap parts of the antenna.
These actions might cause damage to the antenna.
Damage due to actions listed above will void the warranty.
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......