Site preparation
2-12
Make sure that there is sufficient space underneath the ADU to open the service hatch.
Through this hatch you access the ADU modules for service and maintenance.
Mast with 2 braces
Max. free mast
length (steel),
(m)
Outer
Diameter
(mm)
Wall
Thickness
(mm)
Outer
Diameter
for brace
(mm)
Thicknes
s
for
brace
(mm)
1.2
160
10
80
5.0
1.2
200
5
80
5.0
1.6
180
10
80
5.0
1.6
220
5
80
5.0
2
180
10
80
5.0
2
240
5
80
5.0
2.5
200
10
80
5.0
2.5
260
5
80
5.0
Table 2-4: Mast dimensions with 2 braces
Figure 2-11: Free space for access to the service hatch
New antenna
Current antenna
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......