Configuration with the web interface
:
5-25
Alternatively, if your DHCP server can provide a DNS address and you have selected
DHCP client above, then select the same LAN as your DNS source.
Gateway setup
If the ACU needs to communicate with network units outside the specified sub-nets, you
must specify a default gateway (typically a router).
The default gateway can be set as a static IP address. Then set the default gateway source
to static and enter the IP address of the default gateway. To remove the default gateway
set it to 0.0.0.0.
Alternatively, if your DHCP server is able to provide a default gateway address and you
have selected DHCP client above, then select the same LAN as your default gateway
source.
Zeroconf Settings
On LAN ports 1,3 and 4 you can choose to add a zeroconf address in the network
(169.254.0.0).This zeroconf address will be in addition to the existing static or DHCP IP
address. One port at a time can be enabled.
Zeroconf allows devices to connect to a network automatically.
5.4.4
E-mail setup
To be able to send diagnostics and statistics reports through an external Internet
connection using e-mail you must set up a couple of parameters. Contact your IT
department for the specific data.
To configure the e-mail setup, do the following:
1. Go to
SETTINGS > E-mail setup.
2. Enter the data for Outgoing mail server (SMTP), SMTP port number, SMTP type,
SMTP authentication, User name and password. This data is typically provided by
your IT department.
Figure 5-18: Web interface: SETTINGS, E-mail setup (example)
Note
You must set
Outgoing mail server
to an IP address if DNS has not been set up
in
DNS setup
in
To configure the LAN network
on page 5-23.
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......