4-1
Chapter 4
Power and startup
4
This chapter has the following sections:
•
Power up
4.1
Power cables
An AC power cable for the GMU/ACU is included in the delivery.
4.2
Power up
4.2.1
To connect the power cable to the ACU and GMU
1. Connect the power cable to the GMU.
2. Connect the power cable to the GMU.
4.2.2
Power-up procedure
1. Switch on the ACU. The unit starts up and goes through an initialization procedure:
• ACU POST
• Antenna Initializing
• Antenna POST
• READY
This may take some time (up to a couple of minutes).
2. The FV-110GX is ready to be calibrated (for first time power up) or receive data from
the GMU (when in normal operation).
Figure 4-1: ACU - to connect power to DC Input
Figure 4-2: GMU - to connect AC power
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......