Status signalling with LEDs and status messages
7-15
7.4
Status signalling with LEDs and status messages
Built-In Test Equipment
The ADU and the ACU have a Built-In Test Equipment (BITE) function in order to make
fault diagnostics easy during service and installation. The BITE test is performed during:
• Power On Self Test (POST), which is automatically performed each time the system is
powered on.
• Person Activated Self Test (PAST), which is initiated by starting a self test in the web
interface
HELPDESK > Self test
.
For details on error messages after a POST or a self test see
Event list
on page 7-4.
Means of signalling
The FV-110GX provides various methods for signalling the system status.
LEDs
on the
front panel of the ACU are used to signal:
• Power on/off
• Logon
• Fail/Pass
The built-in web interface of the ACU shows any events (BITE error codes) with a short
message describing each error. This is also displayed in the ACU.
In an error situation, one of the following system status messages may be shown:
• ACU POST error
• Antenna POST error
• SAFE MODE (plus information about the specific error, see
System messages
on
page B-1).
7.4.1
LEDs of the ADU modules
Each ADU module has a Power and a Service LED.
For a list of modules see
Removal and replacement of ADU modules
on page 7-17.
LED
Behaviour
Description
Power Steady green
Power supply OK
Off
No power
Service Steady green
Module ok, application
running.
Flashing green
Waiting for upload
Flashing red/green Uploading software
Steady red
Module error or loading error
Table 7-1: LEDs of the ADU modules
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......