Site preparation
2-3
2.2
Site preparation
The following topics have to be considered when installing the ADU:
•
General site considerations
•
Obstructions (ADU shadowing)
•
Blocking zones with azimuth and elevation
•
Safe access to the ADU (radiation hazard)
•
Ship motion and offset from the ship’s motion centre
•
Mast foundation and height
•
Interference from radar, GPS, L-band and other transmitters
•
Condensation, water intrusion and deposits
2.2.1
General site considerations
For optimum system performance, you must follow some guidelines on where to install or
mount the different components of the FV-110GX System.
1. Mount the ADU on stiffened structures with a minimum of exposure to vibrations.
You do not have to align the ADU with the bow-to-stern line of the ship. When
configuring the FV-110GX the azimuth calibration provides the correct azimuth of the
ADU.
Painting the radome
Customers may wish to paint the radome in order to match the vessel’s colour. Cobham
SATCOM’s recommendation is that the radome should NOT be painted because it may
impact RF performance and may lead to over-heating, causing the antenna to go in safe
mode (switch off).
However, painting the radome will not void the general warranty regarding material and
workmanship etc. It is only the performance that cannot be guaranteed. Any paint used
must be non-metallic based.
Important
It is recommended to mount the ADU in a location with as much
360° free
line of sight to the satellite
as possible while making sure that the support
structure fulfills the requirements for the mast foundation.
Содержание FV-110GX
Страница 1: ...GX TERMINAL FV 110GX OPERATOR S MANUAL www furuno com Model ...
Страница 16: ...xiv This page is intentionally left blank ...
Страница 46: ...Installation of the ADU 2 22 N connector interface on the ADU ...
Страница 54: ...To connect the ADU ACU and GMU 2 30 This page is intentionally left blank ...
Страница 110: ...Installation check list Functional test in harbor 6 4 This page is intentionally left blank ...
Страница 135: ...Alternative ground for steel hulls A 5 Figure A 3 Grounding at a dedicated RF ground alternative ...
Страница 164: ...Supported commands C 10 This page is intentionally left blank ...
Страница 165: ...D 1 Appendix D Approvals D This appendix lists the approvals for FV 110GX OEM declaration ...
Страница 166: ...OEM declaration D 2 D 1 OEM declaration ...
Страница 173: ...OD 1 30 Jul 2018 H MAKI ...
Страница 174: ...OD 2 30 Jul 2018 H MAKI ...
Страница 175: ...OD 3 2 Oct 2018 H MAKI ...
Страница 176: ...OD 4 2 Oct 2018 H MAKI ...
Страница 178: ......
Страница 186: ......