136
000878BG-F
7 - Operation
9. Voltage absence check on DC side
•
Access to the wiring box by opening the front wiring box cover
04
.
•
Visually inspect the components to identify the presence of any
overheating, signs of electric arcs, failure of the insulating devices.
10. Check the absence of voltage on the DC terminal block using
the VAT
•
Check the absence of voltage on the DC terminal block measuring
between “Positive (positive side string fuses board
35
)
and protec-
tive earth terminal
37
”.
37
35
Содержание PVS-50-TL
Страница 1: ...Product Manual PVS 50 TL PVS 60 TL from 50 to 60 kW ...
Страница 139: ...139 000878BG F 7 Operation ...