STEP 4 - Inverter country standard and Input configuration
-
Country standard: selection of grid standard
:
Set the grid standard of the country in which the inverter
is installed.
From the moment that the grid standard is set, you have 24 hours to make any changes to the
value, after which the “Country Select > Set Std.” functionality is blocked, and the remaining
time will have to be reset in order to have the 24 hours of operation available again in which
to select a new grid standard (follow the procedure “Resetting the remaining time for grid
standard variation” described in the relevant section).
-
Input mode
:
(See the relevant section of this manual to know how
set the input mode)
1.
Independent
2.
Parallel
Confirm the settings by clicking “END” and the inverter will
reboot.
A notification will confirm that the wizard is completed.