Replacing DC string fuses

Some inverter parts may be subject to voltages that could be hazardous for the operator. Be-

fore performing any work on the inverter, refer to “Inverter switch-off” chapter on this manual to 

know all the necessary step to safely operate on the inverter.

The string protection fuses (where present) in the inverter may need to 

be replaced in the following circumstances:

1. Adjustment of the fuse value on the basis of the type of PV panels used

2. Damaged fuse

Procedure for replacing string fuses from positive 

35

 or negative 

34

 (only 

on -SX, -SX2 model) string fuses board:

PVS-50-TL-SX

PVS-60-TL-SX

PVS-60-TL-SX-CN

PVS-50-TL-SX2

PVS-60-TL-SX2

35

35

34

1.

 Open any AC disconnect switch downstream of the inverter.

2.

 Open the DC disconnect switches 

15

By only disconnecting the AC disconnect switch and the DC disconnect switch, the DC input 

voltage is still present on the fuse board. Use adequate PPE (personal protective equipment).

3.

  Disconnect the strings by disconnectiong the quick fit input connectors 

19

 

20

 

21

.

4.

  Wait enough time for the stored energy to be discharged (min time 30 

minutes).

5. 

Open the wiring box front cover 

04

6.

 Remove the fuse to be replaced

7.

 Introduce the new fuse into the fuse holder on the string fuse boards

Содержание PVS-50-TL

Страница 1: ...Product Manual PVS 50 TL PVS 60 TL from 50 to 60 kW ...

Страница 2: ...llow the instructions given in it since FIMER cannot be held responsible for damage caused to people and or things or the equipment if the conditions described below are not observed The purpose of this document is to support the qualified technician who has received training and or has demonstrated skills and knowledge in construction to install operate and maintain the inverter This manual cover...

Страница 3: ...general information 2 Characteristics 3 Safety and accident prevention 4 Lifting and transport 5 Installation 6 Instruments 7 Operation 8 Maintenance 9 Attachments FIMER PVS 50_60 TL Product manual EN Rev C M000043CG EFFECTIVE 30 07 2020 Copyright 2020 FIMER All Rights Reserved ...

Страница 4: ...rence components 18 Mounting bracket 18 Inverter external view top and rear sides 18 Inverter external view front left right and bottom sides 19 Inverter internal view wiring boxes 20 Communication and control board 21 Principal wiring box components 22 Characteristics and technical data 23 Tightening torques 27 Cable gland clamping range 27 Overall dimensions 28 Dimensions of mouting bracket 29 E...

Страница 5: ...ses 44 Overvoltage surge arresters 44 Other safeguards 44 Safety and accident prevention 45 Safety information and instructions 45 Hazardous areas and operations 46 Environmental conditions and risks 46 Signs and labels 46 Thermal and electrical hazard 47 Clothing and protection of personnel 47 Residual risks 48 Table of residual risks 48 Lifting and transport 49 General conditions 49 Transport an...

Страница 6: ...d and S models 71 Connection of inputs on the SX SX2 models 72 Installation procedure for quick fit connectors 73 String protection fuses SX SX2 models only 77 Sizing of fuses 77 Communication and control board 79 Connections to the communication and control board 80 Ethernet connection 81 Serial Communication connection Slave RS485 1 RS485 2 83 Serial Communication connection Slave Master RS485 M...

Страница 7: ...g the Inverter 158 Registration on Registration website and calculation of security token Admin Plus 159 Replacing DC string fuses 162 Replacing cooling section 163 Replacement of the buffer battery 164 Verification of ground leakage 165 Behaviour of a system without leakage 165 Behaviour of a system with leakage 166 Measuring the isolation resistance of the PV generator 167 Storage and dismantlin...

Страница 8: ... with the manufacturer concerning either hardware or software shall result in the immediate cancellation of the warranty The customer is fully responsible for any changes made to the system Given the countless array of system configurations and installation envi ronments possible it is essential to check the following adequate spa ces suitable for housing the equipment airborne noise produced base...

Страница 9: ... routine maintenance of the equipment Operator and maintenance personnel skills prerequisites Personnel in charge of using and maintaining the equipment must be skilled for the described tasks and must reliably demonstrate their capacity to correctly interpret what is described in the manual For safety reasons only a qualified electrician who has received training and or demonstrated skills and kn...

Страница 10: ...f hot zones or zones with parts at high temperatures risk of burns Risk of explosion Risk of injury due to the weight of the equipment Take care during lifting and transport Indicates that the area in question must not be accessed or that the ope ration described must not be carried out Keep out of the reach of children Indicates that smoking and the use of naked flames is prohibited Indicates tha...

Страница 11: ...ter de energizing of the Inverter from both DC side and AC side DC Direct Current AC Alternate current With isolation transformer Without isolation transformer Positive pole of the input voltage DC Negative pole of the input voltage DC Indicates the centre of gravity of the equipment Indicates the requirement to wear acoustic protection devices in order to prevent damage to hearing ...

Страница 12: ...verall dimensions and equipment identification The customer Installer takes full responsibility if when reading this manual the chronological order of its presentation provided is not observed All information is provided considering occasional inclusion of information in previous chapters In certain cases there may be a need to separately document softwa re functionality or attach supplementary do...

Страница 13: ...s of power supply The inverter can be connected to the electricity grid only in countries for which it has been certified approved The inverter cannot be connected to the DC side in parallel to other inverters to convert ener gy from a photovoltaic generator with a power greater than the nominal power of the single inverter The inverter may only be used in compliance with all its technical charact...

Страница 14: ...rovided in this manual does not substitute the data supplied on the labels affixed to the equipment The labels affixed to the equipment must NOT be removed damaged stained hidden etc for any reason whatsoever PVS 50 TL The labels are NOT to be hidden by foreign objects and parts rags boxes equipment etc they must be regularly cleaned and always kept in sight PVS 60 POWER ALARM GFI 1 4 2 3 1 4 2 3 ...

Страница 15: ...mation 1 Manufacturer 2 Model 3 Rating data 4 Certification marks The labels are NOT to be hidden by foreign objects and parts rags boxes equipment etc they must be regularly cleaned and always kept in sight PVS 60 POWER ALARM GFI PVS 60 TL 1 4 2 3 1 4 2 3 1 4 2 3 1 4 2 3 1 4 2 3 ...

Страница 16: ...that map Inverter model Inverter Part Number Inverter Serial Number consisting of YY Year of manufacture WW Week of manufacture SSSSSS sequential number Week Year of manufacture Manufacturer MODEL NAME POWER ONE ITALY S p A Via S Giorgio 642 Terranuova Bracciolini AR 52028 Italia P N PPPPPPPPPPP WO XXXXXXX SO SXXXXXXXX Q1 SN YYWWSSSSSS WK WWYY SN WLAN SSSSSSSSSS PN WLAN PPP PPPPP PP MacAddress XX ...

Страница 17: ...ype II in both sides AC and DC monitored PVS 50 TL SX PVS 60 TL SX 15 DC input via fast connectors 3 independent MPPT parallel has to be possible Protection fuses on POSITIVE pole only state monitoring not included DC Switch SPD type II in both sides AC and DC monitored PVS 60 TL SX CN 12 DC input via fast connectors 3 independent MPPT parallel has to be possible Protection fuses on POSITIVE pole ...

Страница 18: ...t of main reference components Mounting bracket 01 Mounting bracket 02 Locking brackets 03 Inverter bracket anchor points Inverter external view top and rear sides 03 Inverter bracket anchor points 10 09 04 05 08 07 06 05 03 01 03 02 03 ...

Страница 19: ...na connector 21 Input quick fit connectors channel 3 11 Locking brackets attachment point 22 Anti condensation valve 12 Ethernet cable gland 23 Cooling section 13 Service cable gland 24 Lower support 14 Handle OFF ON OUTPUT AC INPUT DC OUTPUT AC INPUT DC OUTPUT AC INPUT DC INPUT DC 1A 1B 1C 1D 2A 2B 2C 2D 3A 3B 3C 3D PVS 60 INPUT DC 1A 1B 1C 1D 1E 2A 2B 2C 2D 2E 3A 3B 3C 3D 3E 16 11 09 14 11 24 17...

Страница 20: ... 38 AC output screw terminal block 33 DC disconnect switch 39 DC input screw terminal block 34 Negative side string fuses 40 AC filter board 35 Positive side string fuses 41 Parallel MPPT connection points 30 31 32 33 38 40 37 PVS 50 TL SX PVS 60 TL SX PVS 60 TL SX CN 30 31 32 33 38 40 37 PVS 50 TL SX2 PVS 60 TL SX2 35 35 34 41 41 41 36 36 36 PVS 50 TL PVS 60 TL 30 31 32 39 38 40 37 PVS 50 TL S PV...

Страница 21: ...1 line connection on RJ45 connector 57 RS485 2 line connection on RJ45 connector 58 RS485 2 line 120Ohm termination resistor switch 59 RS485 2 communication card housing 60 RS485 MAIN terminal block J5 61 Battery housing 62 SD card housing 63 Grounding kit connector optional kit 64 Inverter data memory card housing 65 Ethernet connector J1 J8 X5 J9 J10 J11 J12 J16 51 50 60 52 53 54 55 58 59 61 62 ...

Страница 22: ...C overvoltage surge arresters installed on these inverter models are Brand PTG Model PV 600 40M2 M 5 elements These components are not replaceable PVS 50 60 TL SX2 SPD 1 2 Overvoltage surge arrester class 1 2 The DC overvoltage surge arresters installed on this inverter model are Brand PTG Model PTV 600 40M2 M 5 elements These components are not replaceable AC overvoltage surge arresters 36 PVS 50...

Страница 23: ...tection for each MPPT SPD Yes 1 for each MPPT Input overvoltage protection for each MPPT surge arrester Type II Type I II optional Isolation Check Complying with the local standard Characteristics of DC disconnect switch for each MPPT versions with DC disconnect switch 1000 V 60 A for each MPPT 180 A in case of parallel MPPTs String fuses SX SX2 versions 15A gPV 1000Vdc 6 Output AC Connection to t...

Страница 24: ...ansformerless TL CE Marking CE 5 7 Safety and EMC Standards IEC EN 62109 1 IEC EN 62109 2 EN 61000 6 2 EN 61000 6 3 EN 61000 3 11 EN 61000 3 12 Grid standard check the availability with your sales channel CEI 0 21 CEI 0 16 DIN V VDE V 0126 1 1 VDE AR N 4105 G59 3 EN 50438 not for all national appendices RD 1699 RD 413 RD 661 P O 12 3 AS 4777 BDEW NRS 097 2 1 MEA PEA IEC 61727 IEC 60068 IEC 61683 V...

Страница 25: ...or each MPPT surge arrester Type II Type I II optional Isolation Check Complying with the local standard Characteristics of DC disconnect switch for each MPPT versions with DC disconnect switch 1000 V 60 A for each MPPT 180 A in case of parallel MPPTs String fuses SX SX2 versions 15A gPV 1000Vdc 6 Output AC Connection to the grid 3W GND no N connection or 4W GND with N connection Grounded WYE syst...

Страница 26: ...and EMC Standards IEC EN 62109 1 IEC EN 62109 2 EN 61000 6 2 EN 61000 6 3 EN 61000 3 11 EN 61000 3 12 Grid standard check the availability with your sales channel CEI 0 21 CEI 0 16 DIN V VDE V 0126 1 1 VDE AR N 4105 G59 3 EN 50438 not for all national appendices RD 1699 RD 413 RD 661 P O 12 3 AS 4777 BDEW NRS 097 2 1 MEA PEA IEC 61727 IEC 60068 IEC 61683 VFR 2014 IEC 62116 Accessories PVS 50 60 GR...

Страница 27: ...2 Max 2 5 Nm Service cable gland 34 PG 21 7 5 Nm DC cable glands 11 M32 only Standard S versions 8 0 Nm AC cable gland M63 10 0 Nm Ethernet cable gland PG 21 7 5 Nm Ethernet cable gland PG 16 5 0 Nm Protective earth terminal external 16 11 0 Nm Protective earth terminal internal 37 11 0 Nm Cable gland clamping range Component Service cable gland 34 PG 21 13 18mm DC cable glands 11 M32 Standard S v...

Страница 28: ...9CG F 2 Characteristics Overall dimensions The overall dimensions are expressed in millimetres and include the mounting bracket OUTPUT AC INPUT DC PVS 60 410 30 685 1160 30 680 750 702 5 285 5 268 5 285 5 268 5 ...

Страница 29: ...00859CG F 2 Characteristics Dimensions of mouting bracket The dimensions of the wall mounting bracket are expressed in millimetres 1160 40 40 270 270 270 270 40 40 270 270 270 270 16 8 702 7 61 7 566 7 61 7 ...

Страница 30: ... are shown below The efficiency curves are linked to technical parameters that are continually being developed and improved and should therefore be considered approximate 93 94 95 96 97 98 99 100 0 10 20 30 50 70 100 Efficiency 80 90 60 40 of rated Output Power 480Vdc 610Vdc 800Vdc Efficiency curves PVS 50 TL PVS 60 TL 93 94 95 96 97 98 99 100 0 10 20 30 50 70 100 Efficiency 80 90 60 40 of rated O...

Страница 31: ...put current values Power reduction due to environmental conditions The power reduction value and the inverter temperature at which it oc curs depend on the ambient temperature and on many operating para meters Example input voltage grid voltage and power available from the pho tovoltaic field The inverter can therefore reduce the power during certain periods of the day according to the value of th...

Страница 32: ...hannel Powered 65 70 Output power Vs Input voltage Power reduction due to the grid voltage The reduction of the power supplied where the grid voltage values are too high or too low is adjusted automatically Grid voltage U Un Output power P Pn Q Qn S Sn 96 100 Pn 110 Pn 93 7 90 100 U U 110 Pn up to 30 C Output power Vs Grid voltage The U and U values could change based on the grid country standard ...

Страница 33: ...0xUn 1 1xUn up to 30 C amb temperature PVS 60 TL Rated output voltage Un 480Vac Rated active power Pn 60kW 60kW up to 30 C amb temperature Nominalapparentpower Sn 60kVA 60kVAupto30 Camb temperature Rated reactive power Qn 60kVAR Cos 0 1 0 100 Pn Capability with grid voltage between 0 937xUn 1 2xUn 110 Pn Capability with grid voltage between 1 0xUn 1 1xUn up to 30 C amb temperature Pout W 1800 900 ...

Страница 34: ...system mainly associated to wiring on the DC side of the inverter and subsequent distribution on the AC side A photovoltaic panel consists of many photovoltaic cells mounted on the same support A string consists of a certain number of panels connected in series An array consists of two or more strings connected in parallel Large photovoltaic systems can include multiple arrays connected to one or ...

Страница 35: ...itions or unsuitable input voltage values When connected in parallel with the grid the alternating current from the inverter flows directly into the domestic or industrial distribution circuit which is in turn connected to the public distribution grid This way the solar energy system compensates for the energy drawn from the utilities connected to the grid to which it is linked When the photovolta...

Страница 36: ...d Each string inverter will work independently of the others and its own photovoltaic module will supply the maximum power available to the grid Notes on the system sizing Decisions on how to structure a photovoltaic system depend on a series of factors and con siderations such as the type of panels the space availability the future location of the sys tem energy production goals over the long ter...

Страница 37: ...s the app for iOS mobile devi ces will be implemented soon Integrated Web User Interface The inverter is equipped with an ethernet and wireless IEEE802 11 b g n board and with an Integrated Web User Interface that allow a full access to all main configuration and parameters of the inverter It can be accessed by using from any ethernet or wireless capable device like laptop tablet or smartphone via...

Страница 38: ...of Plant Viewer en abling non solar power professionals to remotely monitor their own PV plants by using smart phones tablets and iPod Touch with IOS and An droid operating systems All three product previously mensioned work toghether to allow solar power professional and site owners to collaboratively manage solar pow er plant Please contact the FIMER tecnichal support for getting your own plant ...

Страница 39: ...ower into the grid via the phase factor setting see chapter 5 for more details Power feeding modes vary according to the country of installation and the grid companies Limiting the active power fed into the grid The inverter can limit the amount of active power fed into the grid by the inverter to the desired and settable value see chapter 5 for more details Overvoltage surge arrester monitoring T...

Страница 40: ...s with a common browser can be used for this purpose Once powered the inverter will automatically create a wireless network approx 60 seconds after its switch on that will be visible as anAccess Point from the user devices previously mentioned tablet smartphone etc Enable the wireless connection on the device which is being used for the board setup tablet smartphone or PC and connect it to the Acc...

Страница 41: ...g an Aurora Vision ac count With the inverters connected over Etherneth daisy chain and with an available internet connection it will be always possible via Aurora Vision Cloud to upgrede remotely the firmware of the inverters In order to improve the communication services and allow reaching of all the inverters in the chain also in presence of fault it is reccomended to create a ring shape layout...

Страница 42: ...taic generator This inverter version is of the type without transformer that is without gal vanic isolation between the input and the output This allows ultimately an increase in conversion efficiency The operation and the protection management of the inverter is control led by two independent DSPs Digital Signal Processors and a central microprocessor The connection to the distribution grid is th...

Страница 43: ...3B IN3C IN3D IN3E IN1 IN2 IN3 IN SX version DC SPD signal check DC SPD signal check IN IN IN IN1 IN2 IN3 Standard version IN IN IN IN1 IN2 IN3 S version DC SPD signal check DC SPD signal check μ P Communication and control board Expansion slot Grid standard setting 1_RS485 2_RS485 Remote control Alarm Aux T R T R GND T R T R GND R1 R2 GND N C N O C N C N O C DC SPD signal check Communication platf...

Страница 44: ...rter with panels connected in floating mode i e with no earth connections on the positive and negative terminals String fuses The DC compartment can be equipped with string fuses are SX version Only positive side string fuses 35 are preinstalled SX2 version Negative side string fuses 34 and the positive side string fuses 35 are preinstalled The fuses protect the appliance from currents exceeding t...

Страница 45: ...to provide operators with correct information They must therefore read and com ply with the technical information provided in the manual and in the attached documentation The instructions provided in the manual do not replace the safety devices and technical data for installation and operation labels on the product and they do not replace the safety regulations in force in the country of installat...

Страница 46: ...l be adopted for dismantling the equipment The device is not designed to operate in environments that are particularly inflammable or explosive The customer and or installer must appropriately train operators or anyo ne who may come into close proximity of the equipment and highlight with notices or other means where necessary the hazardous areas or operations at risk magnetic fields hazardous vol...

Страница 47: ...y All operations on the equipment must be performed with adequately in sulated clothing and instruments E g insulating gloves class 0 RC category Maintenance operations may only be performed after the equipment has been disconnected from the grid and from the photovoltaic generator Refer to Inverter switch off chapter on this manual to know all the ne cessary step to safely operate on the inverter...

Страница 48: ...itable for the system Overheating of surfaces at temperature transformers accumulators coils etc can cause burns Also be careful not to block the cooling slits or systems of the equipment Use suitable protective equipment or wait for the parts to cool down before switching on the equipment Inadequate cleaning compromises cooling and does not allow the safe ty labels to be read Clean the equipment ...

Страница 49: ...ized staff in change of loading and unloading the components The ropes and equipment used for lifting must be suitable for bearing the weight of the equipment Do not lift several units or parts of the equipment at the same time unless otherwise indicated Unpacking and checking Packaging elements cardboard cellophane staples adhesive tape straps etc may cause cuts and or injuries if not handled wit...

Страница 50: ... Table Weights Weight kg Lifting points n PVS 50 TL PVS 60 TL 70kg 159lbs 4 2 handles and 2 lower support Types of lifting Because of its weight the inverter must be lifted by two people or alter natively using suitable lifting equipment In order to make the inverter easier to manage handles 14 and lower support 24 should be used to lift the inverter The lateral lifting rings should be used only t...

Страница 51: ...h terminal internal 37 Protective earth terminal external 16 2 M6 toothed washer for securing the Protective earth terminal internal 37 Protective earth terminal external 16 4 Wireless antenna 1 Bar for parallel input channels configuration M5x12 screws equipped with cut and flat washer 1 3 Key for front cover key lock 08 1 In addition to what is explained in this guide the safety and installation...

Страница 52: ... and experienced in this job They must also have received suitable training on equipment of this type The installation must be performed by qualified installers and or licensed electricians in ac cordance with the existing regulations in the country of installation The removal of the inverter panels covers allows access to the area dedicated to service personnel the operator is not authorized to a...

Страница 53: ...inverter the general properties of the room etc and the quality of the electricity supply Installation of these models can be carried out vertically or horizontally with a maximum inclination as indicated in the figure PV S 6 0 PV S 6 0 NO NO OK OK OK PVS 60 PVS 60 PVS 60 OK OK OK PVS 60 PVS 60 PVS 60 NO NO PVS 60 PVS 60 PVS 60 PVS 60 50cm 20cm 50cm 30cm 5 MAX OK PVS 60 PVS 60 NO NO OK PVS 60 OK P...

Страница 54: ...t dissipation is not affected by other inverters below The vertical installation is also permitted on a structure which must be composed of a support for the attachment of the bracket and one for the support of the rear pins The vertical installation of two inverters positioned back to back is also permitted on a structure which must be composed of a support for the attachment of the brackets and ...

Страница 55: ... from a position which is close to the installation site of the inverter The radio signal level between the inverter and the wireless router can be improved in a number of ways 1 Change the direction of the antenna The antenna has a dead zone at its tip which should not be positioned facing the wireless router as shown in the figure 2 Find a new position for the router considering the different ty...

Страница 56: ...failure rate of some electronic components increases exponentially because of cosmic radiation The inverter operates normally up to 2000 meters Between 2000 and 4000 meters the inverter works in derating second curve derating by altitude Above 4000 meters the installations are forbidden Installations with a high level of humidity Never open the inverter in the case of rain snow or a level of humid...

Страница 57: ...oi ce must be based on the type of support wall frame or other support the type of anchors to be used and their ability to sup port 4 times the inverter s weight 4x70Kg 280Kg for all models Attach the bracket to the wall with at least 10 attachment screws Depending on the type of anchor chosen drill the required 10 ho les minimum A to mount the bracket Put at least four screws in the upper side an...

Страница 58: ...ng device The inverter is pre equipped with lower support 24 which allow it to be temporarily put vertically on the floor to make it easier the lifting Risk of injury due to the heavy weight of the equipment Insert the heads of six anchor point 03 present on the bracket into the slots on the rear of the inverter 03 ...

Страница 59: ...er from the connector of the wireless antenna located on the left side of the inverter Install the wireless antenna by screwing it into the specific con nector 10 Open the wiring box front co ver turning the 3 key lock 08 in OPEN position and proceed with the wiring and connections depending on the model 10 PVS 60 1 2 3 OPEN LOCK ...

Страница 60: ...he inverter mechanics Any failure of the inverter when it is not connected to earth through the appropriate terminal is not covered by the warranty In compliance with standard IEC 62109 it is necessary Install a earthing cable in one of the protective earth terminal with a minimum section as indicated in the table below Cross sectional area of phase conductors S mm2 Minimum cross sectional area of...

Страница 61: ...and the grid connection point The residual current protection device must meet the following characte ristics PVS 50 TL PVS 60 TL Type A AC Sensibility 500mA 600mA In accordance with article 712 413 1 1 1 2 of Section 712 of IEC Standard 64 8 7 we hereby declare that because of their construction FIMER inverters do not inject ground fault direct currents In the case of systems which consist of sev...

Страница 62: ...n the AC voltage which on reaching the limit set by the standards in the country of installation causes the inverter to switch off The table shows the maximum line conductor length in relation to the section of the conductor itself Line conductor cross section mm2 Line conductor maximum length m PVS 50 TL PVS 60 TL 25 36 m 43 m 35 52 m 62 m 50 75 m 90 m 70 106 m 127 m 95 144 m 173 m The values are...

Страница 63: ...able gland 18 Connection of AC cable is made to the AC output screw terminal block 38 the screw terminal block accepts cables with a maximum cross section of 95 mm2 copper or aluminum AC cable installation Open the wiring box front cover 04 Unscrew the AC cable gland 18 Introduce the cable with a suitable cross section Connect the earth cable to the protective earth terminal internal 37 following ...

Страница 64: ...able 16 Connect the Neutral R S T wires to the respective terminals of the AC output screw terminal block 38 Observe the connection sequence of the phases R S T indicated on the labels placed on the internal AC cables The inverter integrates a grid phase sequence check so that the connection to the grid is allowed only with the phase sequence as indicated in the labels In case the phase sequence i...

Страница 65: ...0 set the switch S1 based on the configuration of the output connections 3WIRES position Three wires configuration R S T 4WIRES position Four wires configuration R S T Neutral Once connection to the AC output screw terminal block 38 has been completed retighten 10 0 Nm torque the cable gland firmly and check seal 40 ...

Страница 66: ...as the inverter might not connect to the grid Checking of strings voltage Measure the voltage present between positive and negative pole of each string If the open circuit voltage of the string is near the maximum value ac cepted by the inverter consider that low ambient temperatures cause an increase in the string voltage different according to the photovoltaic mo dule used In this case it is nec...

Страница 67: ...n order to benefit from the ability to levera ge the full power of the inverter output on a single channel PVS 60 PVS 60 MPPT 1 MPPT 2 MPPT 3 1 MPPT The multi MPPT structure however allows management of three photovol taic generators which are independent of each other one for each input channel and which may differ between themselves with regard to instal lation conditions type and number of phot...

Страница 68: ... from the horizontal and the same orientation to the SOUTH The photovoltaic generator con nected to each of the inputs has a power lower than the power limit of the input channel AND a current lower than the current limit of the input channel This condition is advisable from the point of view of the energy production of the system not from the point of view of inverter operation The photovoltaic g...

Страница 69: ...icated menu Inverter Settings Input mode This configuration is not available for Standard and S versions of the inverter Parallel channel configuration In the inverter SX and SX2 versions the configuration of the input chan nels MPPT can be set in parallel Before carrying out this configu ration disconnect the strings from the inverter and open the AC disconnector This means that the parallel bar ...

Страница 70: ...ng operations must be carried out with the DC disconnect switch internal or external to the inverter OFF Caution The inverters referred to in this document are TRANSFORMERLESS This type requires the use of insulated photovoltaic panels IEC61730 Class A Rating and the need to keep the photovoltaic generator floating with respect to ground no terminal of the generator must be connected to ground The...

Страница 71: ...on of 95 mm2 copper or alu minum OUTPUT AC INPUT DC OUTPUT AC INPUT DC PVS 50 TL PVS 60 TL 39 PVS 50 TL S PVS 60 TL S 39 17 17 DC cable installation Open the wiring box front cover 04 Unscrew the DC cable gland 17 Introduce the cable with a suitable cross section Connect the cables to the terminals on the DC input screw terminal block 39 with a tightening torque of 20 Nm During this operation con ...

Страница 72: ...ng on the model of the connector of the own inverter it is necessary to use the same model and the respective counterpart check the compliant counterpart on the website of the manufacturer or in FIMER Using corresponding parts that are not compliant with the quick fit connector models on the inverter could cause serious damage to the unit and lead to invalidation of the warranty Connect all the st...

Страница 73: ... conforming corresponding part on the manufacturer s website or with FIMER Using corresponding parts that are not compliant with the quick fit connector models on the inverter could cause serious damage to the unit and lead to invalidation of the warranty CAUTION To avoid damage to the equipment when attaching cables pay particular atten tion to polarity 1 WEIDMÜLLER PV Stick quick fit connectors ...

Страница 74: ...t it complies with the connector limits Apply the terminal to the conductor using the designated pliers Weidmüller CTF PV WM4 1222870000 Insert the cable with the terminal into the interior of the connector until you hear the click indicating that the terminal is locked inside the con nector Click Firmly tighten the cable gland using the relevant tool to finish the ope ration 2 0 2 5 Nm WEIDMÜLLER...

Страница 75: ... verifying that it complies with the connector limits Apply the terminal to the conductor using the designated pliers Multi Contact 32 6020 19100 Insert the cable with the terminal into the interior of the connector until you hear the click indicating that the terminal is locked inside the con nector Click Firmly tighten the cable gland using the relevant tool to finish the ope ration 2 5 Nm Multi...

Страница 76: ...verifying that it complies with the connector limits Apply the terminal to the conductor using the designated pliers Amphenol H4TC0002 Insert the cable with the terminal into the interior of the connector until you hear the click indicating that the terminal is locked inside the con nector Click Firmly tighten the cable gland using the relevant tool to finish the ope ration 2 6 2 9 Nm Amphenol H4T...

Страница 77: ...x equipped with string fuses are SX version Only positive side 35 string fuses SX2 version Positive side 35 and negative side 34 string fuses PVS 50 TL SX PVS 60 TL SX PVS 60 TL SX CN PVS 50 TL SX2 PVS 60 TL SX2 35 35 34 A return current can be generated in the event of a fault and relevant short circuit at the ends of one or more PV modules of the system this condition can cause all the current s...

Страница 78: ...termined based on the string current and on the sizing guidelines provided by the manufacturer to avoid unti mely tripping As a general guideline based on the photovoltaic modules short circuit current Isc it is possible to calculate the rating of the fuse with the following formula Irated 1 4 1 5 Isc Fuses must be chosen among the standard commercially available ra tings selecting the value that ...

Страница 79: ... terminal block J7 53 RS485 1 and RS485 2 lines R1 ON OFF and R2 ON OFF remote ON OFF and 5V auxiliary lines terminal block S6 54 RS485 1 line 120Ohm termination resistor switch J8 55 RS485 1 communication card housing J9 J10 56 RS485 1 line connection on RJ45 connector J11 J12 57 RS485 2 line connection on RJ45 connector S5 58 RS485 2 line 120Ohm termination resistor switch J16 59 RS485 2 communi...

Страница 80: ...e ethernet connection can be used to monitor configure and update the firmware remotely and is made on the dedica ted connectors on the interposer board 50 2 cable glands 13 PG21 that can be used to reach the termi nals connectors on the communication and control board Each cable gland accepts a cable from 13 mm to 18 mm diameter As an alternative to each cable gland the two hole gasket supplied c...

Страница 81: ...th shielding STP or FTP UV resistant if used outdoors Type of plug metallic shielded RJ45 The maximum length that can reach these cables is 100 meters and it is always advisable not to let them pass by the power cords to avoid interference with data transmission Maximum inverters number connected over one single daisy chain is 40 In order to avoid ground loop that could create communication issues...

Страница 82: ...ernet connection Star configuration Ethernet connection Daisy chain configuration Customer router Customer router Ethernet connection Ring configuration Customer router Ethernet connection Star configuration Ethernet connection Daisy chain configuration Customer router Customer router On each configuration of connection the maximum length of the cable must be 100m maximum between inverter inverter...

Страница 83: ...t be used for firmware upgrading locally or remo tely through the FIMER monitoring devices When connecting the FIMER monitoring devices the RS485 1 line must be used RS485 2 serial communication line The communication protocol can be set as Aurora proprietary com munication protocol Modbus RTU FIMER protocol or Modbus RTU Sunspec protocol Cables connecting the RS485 line may use two different type...

Страница 84: ...umentation on the accessory components Connection of conductors with RJ45 connectors 56 or 57 The two RJ45 connectors A and B available for the RS485 commu nication are equivalent to each other and can be used interchangeably for the arrival or for the output of the line in realising the daisy chain connection of the inverters RS485 2 RS485 1 IN OUT IN OUT A B A B RS485 1 RS485 2 57 56 53 Table cr...

Страница 85: ...sistance terminal by setting the switch 54 or 58 to the ON position Set a different RS485 address on each inverter in the chain No inver ter can have Auto as an address An address can be freely chosen between 2 and 63 The setting of the address on the inverter is done through the Aurora Manager software When an RS 485 connection is being used if one or more inverters are added to the system at a l...

Страница 86: ...es like energy meter VSN800 wea ther station etc in this case data from accessories will be log ged and transferred to the cloud by inverter itself master mode To know how to connect the accessories to the RS485 terminal block refer to accessory product manual or contact FIMER customer support When an accessory is connected to the RS485 MAIN port it must be added and configured into the Device Acq...

Страница 87: ...ved as regards cable cross section it only needs to comply with the sizing requirement for passing cables through the cable glands and the terminal connector Configurable Relay connection ALARM and AUX The inverter is equipped with 2 multifunction relays with configurable activation It can be connected with normally open contact being con nected between the NO terminal and the common contact C and...

Страница 88: ... must be closed It is necessary to ensure the correct closing of the cover to maintain the IP protection degree of the inverter Carefully close the cover Insert the key in the key lock 08 Turn the key lock 08 in LOCK Repeate the operation for the other key lock 08 Commissioning of the inverter can be started once the cover have been closed IP65 PVS 60 1 2 3 OPEN LOCK ...

Страница 89: ... not use the equipment if you do not have suitable qualifications to work on this equipment or similar products you are unable to understand how it works you are not sure what will happen when the buttons or switches are operated you notice any operating anomalies there are doubts or contradictions between your experience the manual and or other ope rators FIMER cannot be held responsible for dama...

Страница 90: ...r activation The LEDs in various multiple available combinations can signal multiple conditions other than the original single condition see the various descriptions explained in the manual LED isolation fault Interventions after warning of isolation fault When the red LED activates first of all try to reset the alarm using the the embedded web server If the inverter reconnects normally to the net...

Страница 91: ...ss level Updating of the inverter firmware In order to use the software a connection must be established be tween the PC and the inverter by means of an RS485 communica tion line using a PVI USB RS485_232 signal converter 4 Mobile app and web portal Aurora Vision Remote monitoring of the inverter Measurement tolerance The data supplied by the inverter may differ from measurements taken by certifie...

Страница 92: ...umen tation The interpretation or variation of some data is reserved exclusively for specialized and qua lified staff The input voltage must not exceed the maximum values shown in the technical data section 2 in order to avoid damaging the equipment Consult the technical data for further details During operation check that the environmental and storage conditions are correct see installation chapt...

Страница 93: ...ake sure irradiation is stable and adequate for the inverter commissioning procedure to be completed Commissioning could be carried out in two different ways Via FIMER Installer for Solar Inverters APP Recommended mobile APP for commissioning single inverter as well as multi inverter solar plant Via Web UI access point wireless network Integrated Web User Interface enabling setting parameters and ...

Страница 94: ...he last firmware version updating can be executed via Installer for Solar Inver ters mobile APP Close the DC disconnect switches 15 to supply the inverter with input voltage from the photovoltaic generator Make sure irradiation is stable and adequate for the inverter commissioning procedure to be completed The main steps to complete the commissioning procedures are listed below Installer for Solar...

Страница 95: ...he Communication Identification label of each inverters in the right position of that map Above steps are valid for executing any available funtionalities of the Installer for Solar Inver ters mobile APP Inordertolaunchtheinstallationwizardandsocompletethecommissioni procedure please click Commissioning button If needed click prevently on Firmware update button for aligning the firmware of all the...

Страница 96: ...wo ethernet ports of the inverter WLAN immagine wlan it s possible to view the status of the two wireless channels of the inverter and to disconnect the channel 2 Monitored Devices monitored devices add device it s possible to add and config the connected supported accessories to the RS485 in this case modify the data on the rs485 tab according to the characteri stics of the inserted device For mo...

Страница 97: ... the inverter the inverter checks the grid voltage measures the isolation resistance of the photovoltaic field with respect to ground and performs other auto diagnostic checks During the preliminary checks on the parallel connection with the grid the Power LED keeps flashing the Alarm and GFI LEDs are OFF The inverter ONLY creates a parallel connection with the grid if the grid and isolation resis...

Страница 98: ...d setup tablet smartphone or PC and connect it to the Access Point created by the inverter system the name of the wireless network created by the system that the connection should be established with will be ABB XX XX XX XX XX XX where X is a hex digit of the wireless MAC address MAC address can be found on the Communication Identification Label placed on the side of the inverter The screens shown...

Страница 99: ...could be changed by clicking on the upper status bar The required informations during the procedure are STEP 1 Administrator User login credentials Set the Administrator account user and password minimum 8 character for password Administrator account can open and view the contents of photovoltaic site Additionally they can make changes to inverter settings User and password are CASE SENSITIVE Set ...

Страница 100: ...onnection between inverter and installer devices and one between inverter and switch router Whatever means is used to connect the inverter to the router Ethernet cable or Wi Fi it will be always possible to access to the embedded web server also by connecting its own device to the same switch router and reaching the inverter via second radio channel in case of Wi Fi connection with the router by u...

Страница 101: ...te the additional fields at the bottom of the scre en all the fields are mandatory with the exception of the secondary DNS server Available networks SSID Identify and select your own customer wireless net work from all those shown in the SSID field you can carry out a new search of the networks that can be detected with the Update button Once the network has been selected confirm Password Wireless...

Страница 102: ...izard The IP address assigned may vary for reasons connected to the wireless home router setup for example a very brief DHCP lease time If verification of the address is required it is usually possible to obtain the client list and the corresponding IP addresses from the wireless router administration panel If the inverter loses the connection with the home wireless network and therefore loses the...

Страница 103: ... Date Time and Time zone The inverter will propo se these fields when available When it s not possible for the inverter to detect the time protocol these fields have to be manually entered Click on Next button to proceed to the next stage of the configuration wizard ...

Страница 104: ...elect Set Std functionality is blocked and the remaining time will have to be reset in order to have the 24 hours of operation available again in which to select a new grid standard follow the procedure Resetting the remaining time for grid standard variation described in the relevant section Input mode See the relevant section of this manual to know how set the input mode 1 Independent 2 Parallel...

Страница 105: ...r checks the grid voltage measures the isolation resistance of the photovoltaic field with respect to ground and performs other auto diagnostic checks During the preliminary checks on the parallel connection with the grid the Power LED keeps flashing the Alarm and GFI LEDs are OFF The inverter ONLY creates a parallel connection with the grid if the grid and isolation resistance parameters fall wit...

Страница 106: ... for connecting to the grid are met green yellow red The inverter is connected and is feeding power into the grid Normal operation During this stage the inverter automatically tracks and analyses the pho tovoltaic generator s maximum power point MPP green yellow red Disconnection from the grid Indicates lack of grid voltage This condition does not allow the inverter to connect to the grid the inve...

Страница 107: ...for the country of installation Self test not carried out for Italian grid standards only Self test operation failure Incompatibility of the device firmware versions The firmware versions of the various devices comprising the equipment are incompatible and are being updated this is an automatic operation Temperature sensor anomaly detected green yellow red Updating the firmware from an SD card The...

Страница 108: ...ovided during the commissioning phase to access the login page In order to use the Host Name as an alternative to the dynamic IP address the Wi Fi router to which the board is connected when operating in Station Mode must provide the Domain Name System DNS service contact the network administrator for further information regar ding the presence or absence of the DNS service in the Wi Fi router or ...

Страница 109: ...ion label placed on the side of the in verter or applied during the commissioning phase to the plant documen tation When required digit the PRODUCT KEY printed on the Communica tion Identification label and applied during the commissioning phase to the plant documentation as access point password Note that it s required to digit also the dash characters of the Product Key in the password field In ...

Страница 110: ...re CASE SENSITIVE If the Password is lost click on Forgot your password to obtain the access to the Web User Interface and it will be possible to change the password by entering the PRODUCT KEY printed on the Communication Identification label and applied during the commissioning phase to the plant documentation The language of the Web User Interface could be changed in any moment by clicking on t...

Страница 111: ...informations related the status and the production informations of the inverter and photovoltaic plant SETTING Section dedicated to AC and DC line parameters configura tions INVERTER LOG Section dedicated to viewing Alarms and Warnings event log USER Section dedicated to User management NETWORK SERVICES Section dedicated to inverter communication settings and configurations SERVICE TOOLS Section d...

Страница 112: ...oard In the Dashboard sub menu you can view the main informations relat ed the status and the production informations of the inverter and photo voltaic plant and alarm warning active events Status Summary In the Status Summary sub menu you can view the detailed informa tions related the status and the production informations of the system ...

Страница 113: ...d by the grid operator AC Settings Only visible and editable with Admin Plus privileges In the AC Settings sub menu you can setup the parameter related to the Output AC side Changing the above mentioned parameters may prevent disconnection from the grid if the new values exceed those given in the standards of the country of installation If these parame ters are changed to values outside the standa...

Страница 114: ...s the Vstart activation voltage for the input channel 2 This voltage imposes a minimum input voltage on the inverter above which connection to the grid will be attempted 3 VStart 3 New Value This parameter is used to sets the Vstart activation voltage for the input channel 3 This voltage imposes a minimum input voltage on the inverter above which connection to the grid will be attempted Change the...

Страница 115: ...allows you to sets the time between scans Remember that the shorter the scan interval the greater the loss of production due to the fact that energy is transferred to the grid during the scan but not at the maximum power point Each scan takes roughly 2 seconds Digital Inputs In the Digital Inputs sub menu you can disable or enable the Remote ON OFF functionality related to the Remote terminal bloc...

Страница 116: ...n the Ramp Control sub menu you can config the parameter related to the active power ramp up at the start up and after a grid fault event Do not change these parameters if not requested by the grid operator Reactive Power Control Only visible and editable with Admin Plus privileges In the Reactive Power Control sub menu you can configure settings related the reactive power parameters using the fol...

Страница 117: ...Operation Inverter Log In the Inverter Log Section it s possible to view the Alarm and Warning events list that it can be custom filtered by type or by entering a match ing word Clicking on any event to view his details ...

Страница 118: ...of the inverter after 24 hours while the in verter is operating so the Country Standard sub menu on TOOLS section is locked View and edit the AC Settings Reactive Power Control Ramp Control Active Power Control and Frequency Control P f View and edit the MPPT Noise amplitude field in DC Settings on SETUP section To access on the Web User Interface with the Admin Plus user priv ileges it s required...

Страница 119: ... The UP and DOWN buttons scroll through the numerical scale The addresses that can be assigned are 2 to 63 RS485 Baud Rate It allows you to sets the Baud Rate 2400 4800 9 600 19200 34800 57600 115200 RS485 Parity Mode It allows you to set the Parity bit No Parity Even Parity Odd Parity RS485 Protocol Type It allows you to sets the type of protocol to be used for the RS485 line Modbus Sunspec Serve...

Страница 120: ... default setup the rou ter will automatically assign a dynamic IP address to the in verter whenever it tries to connect to the user network With Static the user can assign a fixed IP address to the system The data which has to be entered in order for IP static address assigning to take place will appear Complete the additional fields at the bottom of the screen all the fields are mandatory with th...

Страница 121: ...COMMUNICATION Internal Webserver User Interface IP 192 168 117 1 Direct Access SSID ABB XX XX XX XX XX XX XX XX XX XX XX XX Inverter MAC address IP given by inverter DHCP server IP given by inverter DHCP server PVS 12 0 0 Channel 2 Station Mode In this operating mode is possible to connect the inverter to a WI Fi router in this condition remote monitoring is enabled accessing to Aurora Vision CLOU...

Страница 122: ...e data which has to be entered in order for IP static address assigning to take place will appear Complete the additional fields at the bottom of the screen all the fields are mandatory with the exception of the secondary DNS server SSID name of wireless network Identify and select your own home wireless net work from all those shown in the SSID field you can carry out a new search of the networks...

Страница 123: ... operating in Station Mode must provide the Domain Name System DNS service contact the network administrator for further information regar ding the presence or absence of the DNS service in the Wi Fi router or how to enable it In this way even if the IP address assigned to the inverter should change over time dynamic IP it will always be possible to use the same Host Name which will remain unchang...

Страница 124: ...e are different set tings based on the type of external device connected to the inverter If the inverter acts as CLIENT and the external device as SERVER type the Edit key and select the type of external device According to the device select the communication protocol type in the key and the added device is displayed change the STATE SLAVE ID NAME IP ADDRESS PORT DEVICE settings and save them If t...

Страница 125: ...ity tests of the wireless network connection ethernet connection connection to Aurora Vision and firmware upgrade servers At the end of the test it will be reported the detail of the results Debug Settings In the Debug Settings sub menu it s possible to enable or disable the Debugging access for FIMER Service purposes ...

Страница 126: ...olthedisconnectdeviceofanexternaltransformer orcontrolanexternal device Alittle description of the alarm type e g alarm lamp is required Relay switching can be set in different modes using the setting icon With Output active filter you can select the list of events for which the relays switch Alarm Contact Production The relay is activated status switched whenever the inverter connects to the grid...

Страница 127: ... in its resting position Alarm Contact alarm configurable no latch The relay is activated status switched whenever an error code Exxx or a warning code Wxxx is present from those selected from the list in the dedicated submenu Output Activation Filter of the inverter display The contact returns to its resting position when the alarm signal ends i e before the inverter checks the grid after the ala...

Страница 128: ...t voltage drops below 70 of the activation voltage set This mode is useful for disconnecting any output transformers that could have unnecessary consumption during the night Alarm Contact alarm ALL latch The relay is activated status switched whenever an error code Exxx or a warning code Wxxx is present When the inverter returns to the normal operating state and reconnects with the grid the contac...

Страница 129: ... the behaviour of the alarm relay according to an error table which can be setup with the Web User Inter face In the table it is possible to select the alarms or warnings for which the alarm relay is activated status switched for each individual alarm it is also possible to select the Latch or No Latch mode Country Standard By accessing to the Country Standard sub menu you can modify the grid stan...

Страница 130: ...ilable firmware on FIM ER servers by clicking the CHECK button After the finish of the checking process the availa ble release will be notified on the bottom part of the section Click on UPDATE button to start with the updating process Local firmware Update By updating in local mode the firmware have to be selected and upload ed from local folder of the used devices to access to the web server The...

Страница 131: ...pose these fields when the time protocol is availa ble When it s not possible for the inverter to detect the time protocol these fields have to be manually entered Reset Manufacturing Only visible with Admin Plus privileges In the Reset Manufacturing sub menu it s possible to reset country standard restore default and the connectivity reboot ...

Страница 132: ...he INFORMATION Section it s possible to view the general informa tions about the embedded Web User Interface it s possible to access the following sub menus Product Info Privacy Policy Provider Information Impressum Acknowledgments Release Notes ...

Страница 133: ...ing regulations in the country of installation and in accordance of all safety rules for performing electrical works Inverter operation and maintenance by a person who is NOT qualified is intoxicated or on narcotics is strictly forbidden The customer has civil liability for the qualification and mental or physical state of the person nel who interact with the equipment They must always use the per...

Страница 134: ...External AC source Disconnect any AC external sources Affix designated lock preventing operation onto any external AC di sconnect device affixing designated tags Check on the status LEDs 05 the shutdown command has been carried out Missing Grid Power LED Green Flashing Alarm LED Yellow on solid 5 Operations on External DC source Note In case of absence of External DC disconnect device go on the se...

Страница 135: ...string refer to red area check the correct setting of the current sensor Remove all quick fit DC connector 19 20 21 PV Connector from the wiring box To avoid mechanical interferences use a cable tie to collect the disconnected cables 8 Discharge of the capacitor Wait the internal capacitors to be discharged The discharge time of the stored energy is indicated on the regulatory label 30 minutes ...

Страница 136: ...t the components to identify the presence of any overheating signs of electric arcs failure of the insulating devices 10 Check the absence of voltage on the DC terminal block using the VAT Check the absence of voltage on the DC terminal block measuring between Positive positive side string fuses board 35 and protec tive earth terminal 37 37 35 ...

Страница 137: ... of voltage between Positive earth and Nega tive earth check that there is no voltage on the all DC branches co ming from the photovoltaic field measuring between all the points DC input DC input 11 Voltage absence check on AC side Check there is no voltage on the AC terminal blocks downstream of the external AC breaker measuring between each phase to PE Neutral to PE each Phase to other Phases ea...

Страница 138: ...ct ground Operations in External AC switch Operations in External DC Switch OPERATIONS AT INVERTER LEVEL DC disconnects Inverter Side opening and LOTO of DC switches in all power compartments Remove the DC cables from the terminal block Wait the discharge of the internal capacitor VOLTAGE ABSENCE TEST Voltage absence check on DC side Voltage absence check on AC Side ISSUE WORK PERMIT Issue work pe...

Страница 139: ...139 000878BG F 7 Operation ...

Страница 140: ... know all the necessary step to safely operate on the inverter For cleaning DO NOT use rags made of filamentary material or corrosive products that may corrode the equipment or generate electrostatic charges Avoid temporary repairs All repairs should be carried out using only genuine spare parts The maintenance technician is to promptly report any anomalies DO NOT allow the equipment to be used if...

Страница 141: ...ally from those on installation Check there are no obstacles animals insects leaves vines or plants growing in heat sink or anything which could reduce the heat exchanging capacity of the heat sink at the top at the bottom and between the fins Annual operations Check the tightening of the cable glands and the screw terminal blocks Check the front cover is secured to the wiring boxes If there is no...

Страница 142: ...ied hidden network The Inverter is not able to connect to a hidden network Set the wireless network to which the inverter is to be connected visible network then identify and connect the Inverter to the wireless network as normal The signal between the inverter and the wireless router to which the board wants to connect is too weak Modify the position of the wireless antenna the inverter or the ro...

Страница 143: ...the X with the hex digits of the wireless MAC address of the inverter it can be found on the Wireless Identifi cation Label placed on the side of the inverter or applied during the commissioning phase to the quick installation guide on cover page The DNS or multicast service must be enabled on router Note This connection method doesn t work on Android devices Access the inverter display menù WLAN ...

Страница 144: ...ATION No LED SET COUNTRY or NO NATION Indicates that in the installation phase the grid stan dard was not set on the inverter Set the grid standard of the country of installation following the instructions given in this manual for the inverter If the signal persists also after the grid standard has been set contact customer assistance No code Missing Grid Yellow LED Missing Grid The inverter does ...

Страница 145: ... s normal operation the grid voltage exceeds the mini mum limit set by the operator Check the grid voltage on the inverter Check the grid voltage also on the supply If it is high it means that there is high grid impedance In this case ask the operator to adjust the grid voltage If the opera tor authorises a change to the inverter s parameters agree the new limits with customer assistance If the vo...

Страница 146: ...sence of one or more input strings W018 SPD DC Err Flashing yellow LED only for models with monitored SPD Intervention of overvoltage surge arresters on DC side Overvoltage surge arresters situated on the DC side are damaged Observe the inspection window on each surge arrester DC side If it is red the surge arrester is damaged and the cartrid ge must be replaced If the alarm status persists even i...

Страница 147: ...ne between the inverter unit and the battery unit Check the serial communication line connections between the inverter unit and the battery unit Particularly check the connectors have been installed correctly and that there are no breaks in the cables connecting the two units Error inside the inverter and cannot be checked externally If the problem persists once the inverter has been switched off ...

Страница 148: ...automatically by the inverter and is not an error W053 SOH Low Flashing yellow LED text Bat Warn SOH_L shown on the display in the general information cyclical screens State of health SOH of battery pack low Indicates that the SOH level of the battery pack du ring normal operation is close to the threshold below which it cannot be used The alarm is displayed for SOH values between 51 and 60 Indica...

Страница 149: ...rter has been forced to disconnect from the grid to go into stand alone mode W064 Battery Firmware Update Failed Flashing yellow LED BMS FW UPDT ERR shown on the display in general information cyclical screens Update of battery unit firmware failed Indicates that the update of battery unit firmware has failed Redo the battery unit firmware update procedure If the error warning is shown again conta...

Страница 150: ...input voltage on the inverter just above the activation voltage but which is not accom panied by a sufficient availability of power from the photovoltaic generator typical condition of the stages with limited irradiation If the error signal occurs sporadically it may be due to cau ses external to the inverter limited irradiation and so limited power availability from the PV generator If the proble...

Страница 151: ...nced by the environmental conditions so must be made under the same conditions in which the error occurred If the value measured is lower than 1 megaohm a check must be carried out by a technician installer on the photovol taic generator to identify and eliminate the problem If the value measured is higher than 1 megaohm and the error signal persists contact customer assistance E019 Ileak sense fa...

Страница 152: ... stics of the strings of the PV generator Presence of humidity inside any junction box Measure the isolation resistance using a megohmmeter positioned in the photovoltaic array positive terminal short circuited at the negative pole compared to ground The measurement is strongly influenced by the environmental conditions so must be made under the same conditions in which the error occurred If the v...

Страница 153: ...ters agree the new limits with customer assistance E037 Riso Low Red LED Low value of the isolation resistance only with the Amorphous mode activated This error can appear only if the Amorphous mode is enabled This function is enabled only in inverters equipped with grounding kit and is used to monitor the voltage at the ends of the grounding resistor The error appears when the voltage at the ends...

Страница 154: ...gency stop button activated This code marks the activation of the emergency button button pressed This warning is activated only where there is DC or AC voltage as if the emergency button is pressed while it is operating only by battery it causes the whole system to shut down Check that the emergency button has been pressed and if necessary deactivate it If the warning persists even though the but...

Страница 155: ...ase therefore the cover has NOT been removed or the cable glands have NOT been acted upon disconnect the AC grid and the DC input from the inverter and contact customer assistance E084 BackFeed OC Yellow LED Return current to photovoltaic field The error occurs if the input voltage is particularly low typically in the evening in conditions of low irradiation and indicates a return current from the...

Страница 156: ... the output nominal power Check the limitation value set in Settings Servi ce Power OF Derating LIMxxx CODE 02 Power limitation for over voltage The message indicates that the user has set a power limitation due to overvoltage parameter U 10 min in order to reduce the maxi mum output power of the inverter when the reading of the average grid voltage exceeds certain limits The sampling of readings ...

Страница 157: ...turn to the operating range and for the inverter to cool down If the problem once the ambient temperature has returned within the range persists contact custo mer assistance LIMxxx CODE 06 Power limitation for input over voltage The message indicates that a power limitation is active since an input overvoltage AC has been recorded LIM xxx Power reduction percentage Examples LIM 100 no power limita...

Страница 158: ...r open the wiring boxes in the case of rain snow or a level of humidity 95 Always carefully seal all unused openings Even though the device is equipped with an anti condensation valve air with extremely high levels of humidity can lead to the creation of conden sation inside the inverter As the inverter is almost completely insulated from the outside conden sation can also form after maintenance i...

Страница 159: ... found on the product label giving the identity details of the inverter The production week consists of 4 figures indicating the week first 2 digits and the year of production last 2 digits Stage 2 Registration on https registration solar fimer com Go online and access https registration solar fimer com Set the desired language and click on the specific icon to start registra tion Insert the perso...

Страница 160: ...t the Username corresponding to the email used during registra tion and the Password obtained at the end of Stage 2 Access the section dedicated to requesting the security token Choose the inverter model from the drop down list and insert Serial Number and Week of Production of the inverter which were obtained previously Stage 1 ...

Страница 161: ... the other hand the data are correct the passwords will be shown in a new window and at the same time sent to the email address used for registration The security token enables the Admin Plus privileges which allows the inverter s sensitive parameters to be changed Proceed to changing the aforementioned parameters only when requested by the grid operator or by customer assistance ...

Страница 162: ... from positive 35 or negative 34 only on SX SX2 model string fuses board PVS 50 TL SX PVS 60 TL SX PVS 60 TL SX CN PVS 50 TL SX2 PVS 60 TL SX2 35 35 34 1 Open any AC disconnect switch downstream of the inverter 2 Open the DC disconnect switches 15 By only disconnecting the AC disconnect switch and the DC disconnect switch the DC input voltage is still present on the fuse board Use adequate PPE per...

Страница 163: ...rm the inverter switch off procedure before operate on the in verter 2 Remove the 6 screws of the cooling section OUTPUT AC INPUT DC INPUT DC 1A 1B 1C 1D 1E 2A 2B 2C 2D 2E 3A 3B 3C 3D 3E 23 3 Pull out the cooling section 4 Disconnect the fan connectors 5 Take the new cooling section and connect the 4 fan connectors During this phase pay attenction to connect the fan to the correspondent ca ble the...

Страница 164: ...61 1 Open any AC disconnect switch of the inverter 2 Open any DC disconnect switch Upstream of the inverter on Standard model Open the DC disconnect switch 15 on S SX and SX2 model 3 Disconnect the quick fit input connectors on SX and SX2 model 4 Wait 30 minutes before open the wiring box front cover 04 5 Remove the buffer battery 61 to be replaced 6 Install the new battery taking care to handle i...

Страница 165: ...voltage sufficient for the dimensions of the photovoltaic generator Behaviour of a system without leakage Due to the capacitive effect of the PV generator during the first moments that the voltmeter is connected between one of the two poles and ground it will measure a voltage of about Voc 2 which will tend to stabilize to around 0V if there is no ground leakage as shown in the graph below The int...

Страница 166: ...e between positive pole and ground a voltage of 200V is measured This means that if the system is made up of 10 modules in series and each one supplies 50V the leakage can be located between the 4th and 5th PV module Va voltage measured between pole and 200V Vb voltage measured between pole and 300V In all measurements with the ground of the inverter is indicated V 200 V 300 V t 50 V 50 V 50 V 50 ...

Страница 167: ... a megohmmeter positioned between the two shorted poles and ground of the inverter Mega Inverter IG _ MODELS TL without isolation transformer If the measured isola tion resistance Riso is less than 500 MOhm the inverter may not con nect to the grid because of low isolation of the PV generator to ground MODELS I with isolation transformer If the measured isolation re sistance Riso with floating inp...

Страница 168: ...ncelled bin where present indicates that the product must not be dispo sed of with domestic waste at the end of its useful life This product must be delivered to the waste collection point of the local community for recycling For further information refer to the public body responsible for waste disposal in the country Inappropriate disposal of waste can have a negative impact on the envi ronment ...

Страница 169: ...s port has to be opened in any firewall and forwarded to the inverter preferred Out domain 53 Tcp udp The inverter must be able to resolve domain names to en sure scalability and dynamic changes on the Internet DNS required Out https 443 Tcp As an HTTP client the inverter uses SSL TLS protocol con nections to Aurora Vision servers for secure communica tion The inverter uses this port for all servi...

Страница 170: ...network configuration The inverter requires a valid network configuration in order to operate This information can either be provided by a DHCP server provided by the customers network the default or the inverter can be configured with static network information Regardless of how the inverter is confi gured the following information is required Configuration Purpose IP Address Allows the inverter ...

Страница 171: ...er for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained the rein Any reproduction disclosure to third parties or utilization of its contents in whole or in parts is forbidden without prior written consent of FIMER Copyright 2020 FIMER All rights reserved For more information please contact...

Отзывы: