7 - Operation
Commissioning
Do not place objects of any kind on the inverter during operation! Do not touch the heat sink
while the inverter is operating! Some parts may be very hot and could cause burns.
Before proceeding with commissioning, make sure you have carried out all the checks and
verifications indicated in the section on preliminary checks.
Make sure irradiation is stable and adequate for the inverter commissioning procedure to be
completed.
Commissioning could be carried out in two different ways:
•
Via FIMER Installer for Solar Inverters APP
Recommended mobile APP for commissioning single inverter as well
as multi inverter solar plant.
•
Via Web UI (access point wireless network)
Integrated Web User Interface enabling setting parameters and perfor-
ming commissioning of a single inverter (multi inverter support is not
provided).
Recommended as alternative method for performing single inverter
commissioning.