Proline Promass E TB2 HART
Commissioning
Hauser
61
Parameters
Description
Selection/
User entry
Factory setting
Value 4 display
Select the measured value
shown on the local display.
• None
• Mass flow
• Volume flow
• Corrected volume flow
• Density
• Reference density
• Temperature
• Totalizer 1
• Totalizer 2
• Totalizer 3
• Current output 1
• Current output 2
None
10.4.4 Configuring the output conditioning
The
Output conditioning
wizard guides you systematically through all parameters that have to be
set for configuring the output conditioning.
Navigation path
"Setup" menu
®
Output conditioning