Proline Promass E TB2 HART
Commissioning
Hauser
51
10
Commissioning
10.1
Function check
Before commissioning the measuring device, ensure that the post-installation and post-connection
check have been carried out.
• Checklist for "Post-mounting check" (
• Checklist for "Post-connection check" (
10.2
Switching on the measuring device
After a successful function check, switch on the measuring device.
After a successful startup, the local display switches automatically from the startup display to the
measured value display.
If nothing appears on the local display or a diagnostic message is displayed, refer to the chapter
on "Diagnostics and troubleshooting" (
10.3
Setting the operating language
Factory setting: English or ordered local language
X X X X
X X X
X
X
20.50
Display/operat.
Setup
Main menu
0104-1
Language
English
Español
Français
Language
English
Deutsch
Ã
Ã
Español
Français
Language
English
Deutsch
Anzeige/Betrieb
Setup
Hauptmenü
Sprache
Deutsch
1.
2.
3.
4.
5.
0104-1
0104-1
0104-1
A0013996