Proline Promag 53 PROFIBUS DP/PA
Commissioning
Hauser
89
6
Commissioning
6.1
Function check
Make sure that all final checks have been completed before you start up your measuring point:
• Checklist for “Post-installation check”
• Checklist for “Post-connection check”
!
Note!
When using PROFIBUS PA, please note the following:
• The PROFIBUS interface's technical data must be maintained in accordance with IEC 61158-2
(MBP).
• A normal multimeter can be used to check the bus voltage of 9 to 32 V and the current
consumption of 11 mA at the device.
6.2
Switching on the measuring device
Once the post-connection checks have been successfully completed, it is time to switch on the
supply voltage. The device is now operational.
The measuring device performs a number of power on self-tests. As this procedure progresses the
following sequence of messages appears on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured-value and/or status variables (HOME position) appear on the display.
!
Note!
If startup fails, an error message indicating the cause is displayed.
Messages: PROFIBUS DP
Messages: PROFIBUS PA
PROMAG 53
START-UP
RUNNING
Start-up message
PROMAG 53
START-UP
RUNNING
▼
▼
PROMAG 53
DEVICE SOFTWARE
V XX.XX.XX
Display of current
software version
PROMAG 53
DEVICE SOFTWARE
V XX.XX.XX
▼
▼
PROFIBUS DP
RELAY OUTPUT 1
RELAY OUTPUT 2
STATUS INPUT 1
Existing input/output modules
Input/output modules
PROFIBUS PA
▼
▼
SYSTEM OK
→
MEASURING OPERATION
Beginning of normal measuring
mode
Operation
SYSTEM OK
→
MEASURING OPERATION