INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
35
Rack Setup for the UPS
C A U T I O N
The UPS is heavy (see page 114). A minimum of two people are required to remove the UPS
from its carton. Use the corrugated lifting sling (packaged with the UPS) to move the UPS.
NOTE
Mounting rails are required for each individual cabinet.
To install the UPS rail kit:
1.
Select the proper holes in the rack for positioning the UPS in the
rack (see Figure 17).
NOTE
The UPS takes up position 1 through position 12.
NOTE
Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
Position 1
Position 9
Mounting
Bracket
Top of Rail
Position 12
Position 4
Bottom of Rack
or Top of Other
Cabinet
Bottom of Rail
Figure 17. Front Rail Screw Positions for the UPS
Содержание Powerware BladeUPS
Страница 1: ...Powerware BladeUPS 12 kVA User s Guide ...
Страница 8: ...TABLE OF CONTENTS EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com iv ...
Страница 108: ...COMMUNICATION EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 100 ...
Страница 132: ...TROUBLESHOOTING EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 124 ...
Страница 136: ...WARRANTY EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 128 ...
Страница 137: ......
Страница 138: ... 1642016493 164201649 3 ...