Single Parallel-Ready UPS Installation
W A R N I N G
Only qualified service personnel (such as a licensed electrician) shall perform the electrical
installation. Risk of electrical shock.
NOTE
Do not make unauthorized changes to the UPSs; otherwise, damage may occur to
your equipment and void your warranty.
To install one UPS in a parallel-ready configuration:
1.
Verify that the UPS is installed in a rail kit in a rack containing a
BladeUPS Bar.
2.
Switch off utility power to the distribution point where the
parallel-ready UPS system will be connected. Be absolutely sure
there is no power.
3.
Verify that all circuit breakers are in the OFF (O) position.
NOTE
The load connector breaker controls the load connector only, not the output power
cord.
4.
Unpack the Powerware Hot Sync CAN Bridge Card and verify that
the card was not damaged during shipment (see Figure 38).
Figure 38. Powerware Hot Sync CAN Bridge Card
Содержание Powerware BladeUPS
Страница 1: ...Powerware BladeUPS 12 kVA User s Guide ...
Страница 8: ...TABLE OF CONTENTS EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com iv ...
Страница 108: ...COMMUNICATION EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 100 ...
Страница 132: ...TROUBLESHOOTING EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 124 ...
Страница 136: ...WARRANTY EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 128 ...
Страница 137: ......
Страница 138: ... 1642016493 164201649 3 ...