UPS MAINTENANCE
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
108
Testing New Batteries
NOTE
The batteries must be fully charged and the UPS must not be in Battery mode to
perform the battery test.
NOTE
For an accurate battery test, test the UPS with at least 10% load applied to the UPS.
To test new batteries:
1.
Plug the UPS into a power outlet for 48 hours to charge the battery.
2.
Press any button to activate the menu options.
3.
Select CONTROL then START BATTERY TEST.
During the battery test, the front panel displays “Battery Test
Pending.”
A failed battery test initiates a Battery Test Failed alarm.
To cancel a battery test in progress:
1.
Press any button to activate the menu options.
2.
Select CONTROL, START BATTERY TEST, then CANCEL.
Содержание Powerware BladeUPS
Страница 1: ...Powerware BladeUPS 12 kVA User s Guide ...
Страница 8: ...TABLE OF CONTENTS EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com iv ...
Страница 108: ...COMMUNICATION EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 100 ...
Страница 132: ...TROUBLESHOOTING EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 124 ...
Страница 136: ...WARRANTY EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 128 ...
Страница 137: ......
Страница 138: ... 1642016493 164201649 3 ...