INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
29
Rack Setup for the EBM
C A U T I O N
The EBM is heavy (see page 114). A minimum of two people are required to remove the EBM
from its carton.
NOTE
Mounting rails are required for each individual cabinet.
To install the EBM rail kit:
1.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 9).
Rear
Front
Rail Assembly
Assembly Wing Nuts
Figure 9. Adjusting the Rail Depth
2.
Select the proper holes in the rail for positioning the EBM and other
cabinets in the rack.
Place the first rail for the first EBM at the bottom, using positions 1
and 6 for the front hex-head screws. If you are installing additional
rails, place the next rail 4 holes above the last installed screw (see
Figure 10).
NOTE
Verify that the hole patterns on the rails and mounting brackets align with the hole
pattern on the rack.
Содержание Powerware BladeUPS
Страница 1: ...Powerware BladeUPS 12 kVA User s Guide ...
Страница 8: ...TABLE OF CONTENTS EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com iv ...
Страница 108: ...COMMUNICATION EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 100 ...
Страница 132: ...TROUBLESHOOTING EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 124 ...
Страница 136: ...WARRANTY EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 128 ...
Страница 137: ......
Страница 138: ... 1642016493 164201649 3 ...