INSTALLATION
EATON
Powerware
®
BladeUPS
®
(12 kVA) User's Guide
S
164201649 Rev 3
www.powerware.com
67
13.
Press any button on the front panel display to activate the menu
options, and then press the button until the TURN UPS ON/OFF
menu displays.
14.
Press the
button to display the TURN UPS ON option; press the
button.
15.
Confirm the selection. Press and hold the
button for three
seconds, until the UPS stops beeping.
Verify that the
indicator illuminates solid, indicating that the
UPS is operating normally and any loads not connected through the
load connector are now energized.
If the
indicator is flashing, do not proceed until all alarms are
clear. Check the UPS status from the front panel to view the active
alarms. Correct the alarms and restart if necessary.
The UPS should be in Normal mode. By default, Normal mode
operates on the High Efficiency setting (see “Normal Mode” on
page 76).
16.
To energize a load connected through the load connector, switch
the load connector circuit breaker to the ON (
|
) position.
17.
Press the
ESC
button until the Eaton Powerware logo appears.
18.
If optional EBMs are installed, see “Configuring the UPS for EBMs”
on page 87 to set the number of installed EBMs.
19.
To change any other factory-set defaults, see “Operation” on
page 71.
NOTE
It is recommended to set the Date and Time and the Start Screen.
Содержание Powerware BladeUPS
Страница 1: ...Powerware BladeUPS 12 kVA User s Guide ...
Страница 8: ...TABLE OF CONTENTS EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com iv ...
Страница 108: ...COMMUNICATION EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 100 ...
Страница 132: ...TROUBLESHOOTING EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 124 ...
Страница 136: ...WARRANTY EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 128 ...
Страница 137: ......
Страница 138: ... 1642016493 164201649 3 ...