Installing Communication Options and Control Terminals
To install the communication options and control terminals:
1.
Install the appropriate X-Slot card and/or necessary cable(s) (see
Figure 47 and Figure 48).
Figure 48. Installing Communication Cables
2.
Connect the cables to the appropriate location.
See “Communication Options” on page 91 or “Control Terminals”
on page 94 for detailed information.
3.
Route and tie the cable(s) out of the way.
4.
Continue to “Operation” on page 71 to start up the UPS.
Содержание Powerware BladeUPS
Страница 1: ...Powerware BladeUPS 12 kVA User s Guide ...
Страница 8: ...TABLE OF CONTENTS EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com iv ...
Страница 108: ...COMMUNICATION EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 100 ...
Страница 132: ...TROUBLESHOOTING EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 124 ...
Страница 136: ...WARRANTY EATON Powerware BladeUPS 12 kVA User s Guide S 164201649 Rev 3 www powerware com 128 ...
Страница 137: ......
Страница 138: ... 1642016493 164201649 3 ...