ESIE09-05
Troubleshooting by Indication on the Remote Controller
Troubleshooting
217
3.45
“
UH
”
Malfunction of System, Refrigerant System Address
Undefined
Remote
Controller
Display
UH
Applicable
Models
AII AHU models
RXYSQ4~6PA
Method of
Malfunction
Detection
Malfunction
Decision
Conditions
Supposed
Causes
Improper connection of transmission wiring between outdoor unit and outdoor unit outside
control adaptor
Defect of AHU PC board
Defect of outdoor unit PC board (A1P)
Troubleshooting
Caution
Be sure to turn off power switch before connect or disconnect connector,
or parts damage may be occurred.
(V2831)
NO
YES
YES
After fixing incorrect wiring,
push and hold the RESET
button on the master outdoor
unit PC board for 5 seconds.
Normal
NO
Is
electricity
being introduce for
the first time after
installationor after an AHU
or outdoor unit PC
board has been
replaced?
Is
AHU - outdoor and
outdoor - outdoor unit
transmission wiring
normal?
YES
Normal
NO
Does a malfunction occur?
NO
Does
a "
70
" malfunction occur
for all AHUs in
the system?
YES
NO
Does
a malfunction
occur even after 12
minutes elapses from the
time when electricity is
introduced to AHU
and outdoor
units?
YES
Replace AHU PC board.
Replace outdoor unit PC
board (A1P).
After fixing incorrect wiring,
push and hold the RESET
button on the outdoor unit
PC board for 5 seconds
∗
The unit will not run for up to
12 minutes.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...