ESIE09-05
Troubleshooting by Indication on the Remote Controller
Troubleshooting
183
Troubleshooting
NO
YES
YES
YES
NO
NO
YES
NO
YES
NO
+5V
(4)
(3)
(2)
(1)
Check for the points shown below.
1
Is the stop valve open?
2
Is the HPS connector properly connected to the
main PC board?
3
Does the high pressure switch have continuity?
Are the
three points above
OK?
Rectify defective points, if any.
· Mount a pressure gauge on the high-pressure service port.
· Connect the Service Checker.
· Reset the operation using the remote controller,
and then restart the operation.
Does the stop
due to malfunction (E3)
recur?
Is the HPS
operating value normal
(i.e., 4.0MPa)?
Are the
characteristics of the high
pressure sensor normal?
(See *1.)
Replace the HPS.
Replace the high pressure sensor.
Is the
pressure detected with
the PC board normal?
(See *2.)
Replace the main PC board.
· The high pressure sensor is normal, and the pressure detected with the PC board is also normal.
· The high pressure has really become high.
CHECK 1
Refer to information on P.223, remove the causes by
which the high pressure has become high.
*1: Make a comparison between the voltage of the pressure sensor (*4) and that read by the
pressure gauge.
(As to the voltage of the pressure sensor, make measurement of voltage at the connector, and
then convert it to pressure according to information on “Pressure Sensor”.)
*2: Make a comparison between the high pressure value checked with the Service Checker and the
voltage of the pressure sensor (see *1).
*3: Make measurement of voltage of the pressure sensor.
Connector for high
pressure sensor (Red)
High
pressure
sensor
Micro controller
A/D input
Make measurement of DC voltage between these wires. (*4)
Red
Black
White
Caution
Be sure to turn off power switch before connect or disconnect connector,
or parts damage may be occurred.
Все каталоги и инструкции здесь:
http
:
//splitoff.ru/tehn-doc.html
Содержание ERQ
Страница 2: ...http splitoff ru tehn doc html...
Страница 16: ...Combination Table ESIE09 05 6 General Information http splitoff ru tehn doc html...
Страница 22: ...Specifications ESIE09 05 12 Specifications http splitoff ru tehn doc html...
Страница 30: ...Functional Parts Layout ESIE09 05 20 Refrigerant Circuit http splitoff ru tehn doc html...
Страница 52: ...Outline of Control ESIE09 05 42 Function http splitoff ru tehn doc html...
Страница 63: ...ESIE09 05 Wiring Diagram of Control Box Control Box 53 3 2 F box http splitoff ru tehn doc html...
Страница 127: ...ESIE09 05 Installation and Operation Manual 117 Part 8 Installation and Operation Manual http splitoff ru tehn doc html...
Страница 240: ...Wiring Diagrams ESIE09 05 230 Appendix 2 2 Field Wiring ERQ 100 125 140 A7V1B http splitoff ru tehn doc html...